To: Brice [email protected]]
Cc: [email protected][[email protected]]
From: Doug Schoettle
Sent: Wed 6/17/2009 6:47:34 PM
Subject: Re: FW: Conduit Bank Approval.
Jeffrey, I recommend that the electrical and technology conduit bank that was installed under
the concrete plant be extended to the new electrical building at this time. A trench is being dug
for the extension of the under sea power cable to the electrical building, now is the time to install
the extra conduit in the same trench. Regards, Doug
--- On Wed, 6/17/09, Brice Gordon .ce > wrote:
From: Brice Gordon amm>
Subject: FW: Conduit Bank Approval.
To: "Doug Schoettle"
Date: Wednesday, June 17, 2009, 3:19 PM
Doug,
FYI Brice
Forwarded Message
From: J Epstein <[email protected]>
Date: Wed, 17 Jun 2009 13:56:32 -0400
To: Brice Gordon
Subject: Re: Conduit Bank Approval.
this is a doug issue
On Wed, Jun 17, 2009 at 2:04 PM, Brice Gordo wrote:
To: JEE
Attached is a proposal for a 250ft extension of the 10 Pipe Conduit bank to
the new Electrical building.
After reviewing with Tom and Doug , I would like to submit the above
proposal for your review/approval
The first leg was installed (early 2006) prior to cement plant installation
Tom is now trenching for the new electrical supply to mechanical building.
Proposed 10 pipe Conduit bank is for the future build out of the existing
compound and if this work is not performed at this time we are effectively
abandoning existing Conduit bank.
Amount: $21,610.00
EFTA_R1_01519298
EFTA02443799
Br :ce
End of Forwarded Message
EFTA_R1_01519299
EFTA02443800
ℹ️ Document Details
SHA-256
702717456bd544bdd4b8f99025b8c2050fcdf8c17491669939133cc6cbaaa2cb
Bates Number
EFTA02443799
Dataset
DataSet-11
Document Type
document
Pages
2
Comments 0