📄 Extracted Text (161 words)
EFTA00597269
ty.s • D filTAMICIAIII
ALI APPROVED'AS NOTED
O RIMSED AND RES:JEW
VMSNMI
Check is Only for Conformation with the
.417 flew Ccfain;
Design Concept of the Project and Compliance CoOte
with the Information Given In the Contract it niti•
Docut:nts. Contractor is Responsible for
0imsr ne to be CorArmed and Corrected
Job a, for Inforilstla that pertains solely i
tt• Fabrication riocess or to Techniques of s I atiift".•••
ruction; and for Coordtrration of the I
of All Tra r
a Wait
1 tree a IL Mae
'RON ISLANDS WATER MD ela nag
SO OW •
r __ AUTHORITY"
I it
pen
Cef
a -a--
L
OSOMmendildelltl;
1. Through logic the following conditions
all apply at SSC Vista Pad Mount
Synchour when on generator power
When way 21$ closed, way 1Is open
t SwertAter,
open transition) to prevent energlution
of TX-MV1.
IMO Si 0. 00 11121/Al
04114£ 0IACIAVA
ONE UNE DIAGRAM
- la; RIMY
S I MN dt aflame
Ffinahzed
ℹ️ Document Details
SHA-256
70b152604e075706545b55e7d441f31b72846e78472ad81049c38a0bf2c575b5
Bates Number
EFTA00597269
Dataset
DataSet-9
Document Type
document
Pages
1