EFTA00808911
EFTA00808912 DataSet-9
EFTA00808913

EFTA00808912.pdf

DataSet-9 1 page 387 words document
P17 P23 V16 D1
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (387 words)
8114/2018 Gmail - pool quote M Gmail Kyle reeels pool quote Rick Rossi Tue. Aug 14. 2018 at 8.20 AM To: Kyle mann Rick Rossi Inc. 7779 Estate St. Peter St. Thomas. V.100802 Dth22/2018 Byte Rest. for Utile SL James Swimming poet renovalicen Brag pole pod) Remove tiles and prepare for new tiles (195 linear feel bekis add 10% to order Cost of tees and grout not included in quote.Not sure if you1I be using 1 fool of tie or less so cyder wit have lobe adjusted. Remove any hollow amass and faitng plaster as necessary. Clean pod and prepare for new Diamond Bnte pool plaster Super 84e Apply Bonding Kota Apply Diamond BOO pool plaster ( kid 84e ) Add wash and powermosh plaster to expose the finish. Apply KrystaCure lo poster as a wing agent which should eliminate the scaling Pool is ready to be Bled with water. Water supplied by LSJ Total for all materials and labor. 584000.00 This Odudes al labor and materials except tiles and grout. All transportation wit be provided by LSJ 50% deposit needed to order matenals and confirm work Balance due wthn 30 days or Merest of 1.5 added monthly. Thank you for your consideration. Rick Rossi Rick Rossi Inc. 7779 Estate Si. Peter St. Thomas. V.1.00802 08/14/2018 Kite Reavis, for Lithe St James Swimming pool rent/memo (Math pool) Remove tiles and prepare for new tiles (195 linear *el th/us add 10% to order Cost of tiles and grout not Ocluded in quote.Nth sure if you1I be using 1 Tool of tie or less so ceder roil have lobe adjusted. Remove any hollow area's and faitrig plaster as necessary. Clean pool and prepare for new Diamond Bnte pool plaster Super B4e Apply Bonding Kota Apply Diamond Bribe pool plaster ( kid 84e ) Add wash and power wash plaster to expose the finish. Apply Krystaare to plaster as a citing agent which should eliminate the stager; Pod is ready to be filled with water. Water supplied by LSJ Told for all materials and labor. 557500.00 This indudes al labor and materials except files and grout. M transportation w8 be provided by LSJ 50% deposit needed to order materials and confirm work Balance ekewithin 30 days or interest of 1.5 added monlety. Thank you for your consideration. Rick Rossi EFTA00808912
ℹ️ Document Details
SHA-256
710fc3f92bd817d69bbe620b17582f205a37fec4b0c71c54e974579c94dffef8
Bates Number
EFTA00808912
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!