📄 Extracted Text (387 words)
8114/2018 Gmail - pool quote
M Gmail Kyle reeels
pool quote
Rick Rossi Tue. Aug 14. 2018 at 8.20 AM
To: Kyle mann
Rick Rossi Inc.
7779 Estate St. Peter
St. Thomas. V.100802
Dth22/2018
Byte Rest. for
Utile SL James
Swimming poet renovalicen Brag pole pod)
Remove tiles and prepare for new tiles (195 linear feel bekis add 10% to order
Cost of tees and grout not included in quote.Not sure if you1I be using 1 fool of tie or less so cyder wit have lobe adjusted.
Remove any hollow amass and faitng plaster as necessary.
Clean pod and prepare for new Diamond Bnte pool plaster Super 84e
Apply Bonding Kota
Apply Diamond BOO pool plaster ( kid 84e )
Add wash and powermosh plaster to expose the finish.
Apply KrystaCure lo poster as a wing agent which should eliminate the scaling
Pool is ready to be Bled with water. Water supplied by LSJ
Total for all materials and labor. 584000.00
This Odudes al labor and materials except tiles and grout.
All transportation wit be provided by LSJ
50% deposit needed to order matenals and confirm work
Balance due wthn 30 days or Merest of 1.5 added monthly.
Thank you for your consideration.
Rick Rossi
Rick Rossi Inc.
7779 Estate Si. Peter
St. Thomas. V.1.00802
08/14/2018
Kite Reavis, for
Lithe St James
Swimming pool rent/memo (Math pool)
Remove tiles and prepare for new tiles (195 linear *el th/us add 10% to order
Cost of tiles and grout not Ocluded in quote.Nth sure if you1I be using 1 Tool of tie or less so ceder roil have lobe adjusted.
Remove any hollow area's and faitrig plaster as necessary.
Clean pool and prepare for new Diamond Bnte pool plaster Super B4e
Apply Bonding Kota
Apply Diamond Bribe pool plaster ( kid 84e )
Add wash and power wash plaster to expose the finish.
Apply Krystaare to plaster as a citing agent which should eliminate the stager;
Pod is ready to be filled with water. Water supplied by LSJ
Told for all materials and labor. 557500.00
This indudes al labor and materials except files and grout.
M transportation w8 be provided by LSJ
50% deposit needed to order materials and confirm work
Balance ekewithin 30 days or interest of 1.5 added monlety.
Thank you for your consideration.
Rick Rossi
EFTA00808912
ℹ️ Document Details
SHA-256
710fc3f92bd817d69bbe620b17582f205a37fec4b0c71c54e974579c94dffef8
Bates Number
EFTA00808912
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0