EFTA01169194.pdf
👁 1
💬 0
📄 Extracted Text (572 words)
From: Daphne Wallace
To: Jeffrey Epstei
Cc: Brice Gordon Sarah K
Subject: •otograp eptem er 30, 2011
Date: Fri, 30 Sep 2011 21:46:26 +0000
Attachments: 1-Courtyard.JPG; 2-Grading_main engineering_road.JPG; 2-
Grading_main_engineering_road_c2).JPG; 2-Grading_main_engineering_road_(3).JPG; 2-
Grading_main_engineering_road_(4).JPG; 2-Grading_main_engineering_road_(5).JPG; 2-
Grading_main_engineering_road_(6).JPG; 2-Grading_main_engineering_road_(7).JPG; 2-
Grading_main_engineering_road_(8).JPG; 2-Grading_main_engineering_road_(9).JPG; 2-
Grading_main engineering_road_(10).JPG; 2-Grading_main engineering_road_(11).JPG;
3-Main_pooljhelter.JPG; 3-Main_pool shelter (2).JPG; 3-hiain_pool shelter (3)..TPG; 3-
Main_pool shelter_(4).JPG; 4-Main ligits.JPG; 4-Main_lights_(2).JPG; 5-
Cabana 4 1)ath.JPG; 5-Cabana_4 b;th_(2).JPG; 5-Cabana 4.JPG; 8-Flagpole_bath.JPG; 8-
Flagpole_bath_(2).JPG; 8-Flagpole bath_(3).JPG; 8-Flagpole_bath_(4).JPG; 8-
Flagpole_bath_(5).JPG; 8-Flagpole_bath_(6).JPG; 9-Main_pool_bath.JPG; 9-
Main_pool bath_(2).JPG; 10-Palm trees.JPG; 10-Palm_trees_(2).JPG; 11-Sod_-
_postponedlby_sod farrn.JPG; 12-Tiling.JPG; 12-Tiling_(2).JPG; 12-Tiling_(1).JPG; 13-
Main_planter.JPG; l3-Main_planter_(2).JPG; 13-Main_planter (3).JPG; 13-
Main_planter (4).JPG; 13-Main_planter (5).JPG; 14-Brice_cottage.JPG; 14-
Brice_cottage_(2).JPG; 14-Brice cottage_(3).JPG; 14-Brice_cottage_(4).JPG; 16-
_Info_center spool_table.JPG; 1g- Info center spool_table_(2).JPG; 16-
Info_center spool_table_(3).JPG;-16-ETectrify_info_center.JPG; 16-
Electrify_info_center (2).JPG; 18-Grotto.JPG; 18-Grotto_(2).JPG; 19-
Blue_beach_landscaping.JPG; 19-Blue_beach_landscaping_(2).JPG; 19-
Blue_beach_landscaping_(3).JPG; 19-Blue_beach_landscaping_(4).JPG; 19-
Blue_beach_landscaping_(5).JPG; 19-Blue_beach landscaping_(6).JPG; 20-Heli wall.JPG;
23-Steps_to_library.JPG; 23-Steps_to library_(2),IPG; 23-Steps_to_library_(3).JPG; 26-
Driveway_entry.JPG; 29-Flagpole_grading.JPG; 29-Flagpole_grading_(2).JPG; 29-
Flagpole_grading_(3).JPG; 29-Flagpole_grading_(4).JPG; 29-Flagpole_grading_(5).JPG;
29-Flagpole_path.JPG; 29-Flagpole_path_(2).JPG; 29-Flagpole_path_(3).JPG; 29-
Flagpole_path_(4).JPG; 30-Flagpole wall_banIcs.JPG; 30-Flagpole_wall banks_(2).JPG;
30-Flagpole wall banks_(3).JPG; 40-Banquette.JPG; 40-Banquette_(2).JPG; 40-
Banquette_(2).JP6; 40-banquette_(4).JPG; 40-Banquette_(5).JPG; 42-
High_Flagpole_road.JPG; 44-St_John terrace.JPG; 44-St_John terrace_(2).JPG; 44-
St_John_terrace_(3).JPG; 46-Motorcourt.JPG; 46-Motorcourt_(2).JPG; 46-
Motorcourt_(3).JPG; 46-Motorcourt_(4).JPG; 46-Motorcourt_(5).JPG; 46-
Motorcourt_(6).JPG; 46-Motorcourt_(7).JPG; 46-Motorcourt_(8).JPG; 46-
Motorcourt_(9).JPG; 46-Motorcourt_(10).JPG; 46-Motorcourt_(11).JPG; 46-
Motorcourt_(12).JPG; 46-Motoreourt_(13).JPG; 46-Motoreourt_(14).JPG; 47-
Archer_platform.JPG; 48-Bed.JPG; 48-Bed_(2).JPG; 48-Bed_(3).JPG; 48-Bed_(4).JPG; 48-
Bed_(5).JPG; 48-Bed_(6).JPG; 48-Bed_(7).JPG; 48-Bed_(8).JPG; 48-Bed_(9).JPG; 48-
Bed_(10).JPG; 49-Plants_from Italian woman.JPG; 49-
Plants_fromitalian_womani1).JPG; 119-Plants_fromitalian_woman_(3).JPG; 49-
Plants_fromitalian_woman_(4).JPG; 49-Plants_fromitalian_woman_(5).JPG
Greetings Mr. Epstein,
September 30 project list photographs, and 3 new items, for your review and comments. The items highlighted
were not photographed today:
EFTA01169194
I. Courtyard
2. Grading main engineering road
3. Finish Main pool shelter
4. Tennis court and other main lights
5. Cabana 4
6. Gym - cabinet company visited site - will forward drawing and proposal
7. Cabana 4 furnishing - bed/headboard/armoire on site - Sarah researching round bedside tables - bath fixtures
on site
8. Flagpole bath and cabana - need JE clothes and shoes - bath fixtures on site - closet accessories on order
9. Main pool bath - furnish - fixtures on site
10. Palm trees - deliver to island 10/1
11. Sod - delivery postponed by sod farm
12. Tiling - in progress
13. Main planter
14. Brice cottage
15. Dock house
16. Electrify info center
17. Five Palms
18. Grotto
19. Blue beach landscaping - plant palms week of 10/1
20. Heli wall
21. Curb for all roads
22. Night lights to motor court - on order
23. Steps to library
24. Library path
25. Benches
26. Driveway entry
27. Pool ladders
28. Flagpole lights are too hot
29. Flagpole grading
30. Flagpole wall banks
31. Stereo - Larry ordering speakers, Brice ordering speaker wire
32. Computer - Lion installed
33. Molyneux desk - not on site - in process of being crated - no shipping date as yet
34. Jet skis - shipping 9/28
35. Midnight Express - Larry has until 10/10 to try to sell - if not, will arrange shipping to island
36. Library landscaping
37. Pool palms - deliver to island 10/1 (please see #10)
38. Color in basket
39. Waterfall
40. Banquette
41. Big wind doors
42. High Flagpole road - bulldozer is on the main house grading, Peter is working on the main planter
preparation, the road clearing is in progress
43. Main pool shelter (please see #3)
44. St. John terrace
45. Hangar - painting in progress
46. Motor court
47. Archer platform
48. Bed
49. Plants bought from Italian woman - presently located on the beach and at the nursery
Respectfully submitted,
EFTA01169195
Daphne
EFTA01169196
ℹ️ Document Details
SHA-256
721d46396b62d5f0d8ff93e72f1cafc51e03d5d6d54f4780ca40e07fddab9a81
Bates Number
EFTA01169194
Dataset
DataSet-9
Type
document
Pages
3
💬 Comments 0