📄 Extracted Text (118 words)
Danny Vicars
Project List
-Mechanical Building: Complete move-in and organization of electrical
shop.
-Landscape Lighting: Continue adjustments to landscape lighting-stay
late for the next 3-4 weeks to fine tune.
-Landscape Lighting Timers: Upgrade timers.
-MC Pool: Switch out manifold & filters and install variable speed
pumps.
-Tunnel: Replacing overhead bulbs and ballasts and dropping down
from ceiling for ventilation.
-MC: Switch out solar lanterns to new electrical. Have on hand.
-Relax Room: Review air conditioning issue with Atlantic.
-Info Center: Replace inoperable fan.
-Flagpole Pool Cabana: Repair dryer.
-Flagpole Pool Cabana: Assist with kitchen renovation.
-Library: Review flickering bookshelf lighting and find solution.
-Pebble Beach: Check solar system.
-Relax Room: Assist with renovations.
-Water Pumps: Reset master/slave.
EFTA01098766
ℹ️ Document Details
SHA-256
724dcfbac8e6247c4b18ca50c753ff1f1a23c397e4fa66299d5cee2949cf17df
Bates Number
EFTA01098766
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0