👁 1
💬 0
📄 Extracted Text (298 words)
From: Warwick Wicksman
To: Jeffrey Epstein <[email protected]>
CC: Gary Kerney
Subject: RE:
Date: Thu, 09 Dec 2010 16:24:11 +0000
Jeffrey,
I will get you an updated schedule for progress deliverables.
You left me a voice message with some additional pool comments. Do these apply to the Main Residence
Pool, or the Flagpole Pool, or both:
• Raise elevation of pool above the ground, so it is up 6" to 1, so you can sit on the edge of the
pool. We typically need 4'-S' of deck around the pool. We can raise the deck at the Flagpole Pool,
so you can sit on the edge, facing away. I am not sure if you wanted this at the Main Residence
pool, but since the pool is enclosed, I am not sure that it makes sense.
• Continuous gutter coping. Is that your preference?
• Lights over deck only for access. (Ok for Main Residence. Would not apply to Flagpole pool.)
Thanks,
Warwick
Warwick Wicksman, AIA
Princi al
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
Click here to view Gensler's 2010 Annual Report.
From: Jeffrey Epstein [mailto:[email protected])
Sent: Thursday, December 09, 2010 2:20 AM
To: Warwidc Wicksman
Cc: Gary Kerney
Subject:
please provide me dates on which i can expect work„ thanks
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
EFTA00710810
destroy this communication and all copies thereof,
including all attachments.
EFTA00710811
ℹ️ Document Details
SHA-256
726bd994456f9cf3bf2c872cd3707bc039b59975b7224c7e648fb71fc8892d6e
Bates Number
EFTA00710810
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0