EFTA02453646
EFTA02453650 DataSet-11
EFTA02453651

EFTA02453650.pdf

DataSet-11 1 page 241 words document
P17 V16 P21
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (241 words)
From: David Mitchell Sent: Wednesday, May 2, 2018 12:31 PM To: Jeffrey Epstein Update on TCO , working completing this list TODAY Please see the below sign offs needed for Grant to complete the TR1 forms, which will be the remaining paperwork to obtain TCO for 19 West 31 Street <x-apple-data-detectors://0> . Grant has requested the below in order to complete the Till forms: 1. Structural - the walls/ceilings closed up, not possible for an inspection; therefore, need the structural engineer to sign off on all nonconformities. The structural engineer needs to approve work completed. EWA WORKING ON LIST 2. Sprinkler system - no submittals on site / The MEP engineer needs to sign off on the installed sprinkler heads and confirm the installed sprinkler heads were per the submittals. GRANT CONFIRMING LOCATION OF PHOTO 3. Masonry anchors - the walls/ceilings closed up, not possible for an inspection; therefore, need the structural engineer to approve the SOP conditions and if possible, have the GC provide photos and info on installation. EWA TO CONFIRM 4. Fenestration - need an email confirmation from architect stating that the U-factor, R values, and insulation of field work conforms to specifications. 5. Fire protection • need the DOB / FDNY sign offs from Metropolis/ACP Electrical. 6. Mechanical - then one last item, Grant inspector needs to do the final Mechanical inspection. DAVID MITCHELL Mitchell Holdings LLC 745 Fifth Avenue New York NY 10151 USA EFTA_R1_01554616 EFTA02453650
ℹ️ Document Details
SHA-256
72aa5e2725de0d71f467ff1b051cdedb67fffee3b716e235d3dfa790f815e746
Bates Number
EFTA02453650
Dataset
DataSet-11
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!