From:
Sent: Thursday, October 4, 2012 12:02 AM
To: Jeffrey Eps
Cc: Rich Kahn;
Subject: Big N
Attachments: barge1jpg; barge2jpg; LS1 Big N Reburb.pdf
Jeffrey
As requested attached are 3 quotes for work on Big N, also the present=deck and storage conditions 1st quote from Bob
Kassner, not to exceed price of $32,600.00 2nd quote from Sub Base Dry Dock for an estimated cost of $40,000.=0 3rd
quote from Island Rigging for hydraulic hose and fitting install, =his work would be and in addition to BOTH quotes=/div>
Please note the I also recieved a bid for Stainless steel fitting fo= 24K, I did not submit, fittings would out last hoses!!!
please add $2,500.00 for misc items such as wiring, gauges, fire extin=uishes, paint etc, all labor would be in house (LSJ
Employees)
My recommendation after reviewing scope of work is Have Bob Kassner do the work, LSJ to support and supply
hydraulic fitt=ngs and hoses Barge would be located at LSJ or Red Hook depending on weather and wor=.
This would allow us to oversee work and assist when needed directly
At this time the Bilge cleaning, doors, plex glass windows have=been completed, but as the photos show the rest of the
barge needs TLC Monday 8th Big N will be brought to LSJ, complete clean will take plac=, it will take 2 days ( in house
labor) Carlos will be in charge
I can forward pictures of present condition, wiring, hyd=aulic fittings etc, if required.
For your consideration
1
EFTA_R1_02073219
EFTA02702021
ℹ️ Document Details
SHA-256
731e0636a31e529a0862ff8a3eba63a2059161a66c44c8f90cef28ca83b550fe
Bates Number
EFTA02702021
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0