📄 Extracted Text (489 words)
From: Eric Roth a
Sent: Saturday, April 21, 2018 1:41 PM
To: Jeffrey E.
Cc:
Subject: Open item list and estimated pricing
Jeffrey,
Many of the items below require your d=finition / confirmation. We have done our best to provide a financia= "feel" for
these items. Others are straightforward (airstair steps).
Furthermore, materials need to be sele=ted for the window line, grospoint for closets, etc...
Have a great day!
Eric
<=pan style="font-size:16.0pt;font-family:"HOK Sans Pro Bold",sa=s-serif;color:#A6A6A6;mso-style-textfill-fill-
color:#A6A6A6;mso-style-text=ill-fill-alpha:100.0%">Plan D, LLC
1. = lay seat in wood $4,600 - $=,000
2. = Toilet paper cover — =eed to discuss design. $$1,200 - $2,400?
3. = Mirror re-do — $No ch=rge
4. = Aft lay sink drain handle n=eds rubber and tightening $900 - $1,400
5. = Coffee maker area — t=ere is no existing fan in this area
6. = Aft galley kettle steam r.7p11; $ we do not have a "fix" for removing the steam generated =rom the kettle
EFTA_R1_01567778
EFTA02461623
7. = Fabricate new lightweight g=lley sink cover - $ No charge
8. = Divan mod to be determined =nd materials $96,700* Does not include R/H mid cabin removal of existing d=van?
Create new lower sidewall and ledge? Need design direction / commitment so that we can price compete modificati=n
of this center cabin area.
9. = New carpet - $39,800</=:p>
10. Re-veneer fwd side of pocke= door — no peep hole or vacant sign — need definition. C=mplete door?
11. Re-veneer cabin side of aft=lav door cover vacant sign $800 - $1,200 if just a cover plate?=/span>
12. Insulate fwd lay door? Need=to discuss potential design $$1,800 - $2,600?
13. Remove windowline monitors =nd recover $21,360
14. Remove table and lower side=panel "bumpout" at the #3 seat locations $24,300
15. Fabricate new veneer T.V. c=ver on the L/H forward cabin bulkhead $3,600
16. iPhone charger at the R/H #1= ledge like on GIV $3,400
17. Raise arms on co-pilot seat=to match pilot seat, make pilot seat softer and stop pilot seat from shaki=g. $1,600 -
$2,100
18. Fabricate leather arm rest =overs for all cabin single seats $4,840
19. Stabilize jump seat $T&= $400 - $1,500?
20. New airstair covers $4,660a:p>
21. Tighten latches $ T&M &=8211; estimate $800 - $1,400
22. Replace cabin upwash / down=ash lights with new LED lighting $46,700
23. Replace grospoint on three =3) closets, $17,600
24. Remove blow out covers at R=H# 3 & L/H #3 seats $This must stay and are required by Gulfstream
25. Carry on work station $Need= to be designed to identify pricing. Estimate $15,000 - $20,000=/o:p>
26. Organize galley drawers $ N=ed to know how many drawers, what is in each drawer before pricing
27. Adjust and strengthen side =all table hinges $T&M
2
EFTA_R1_01567779
EFTA02461624
Best Regards,
Eric
ERIC H. ROTH<=> I PRESIDENT
P</=pan> 631.737.5900 I C=/b> 516.857.6533 I I www.intljet.=om
<http://www.intljet.com/> <http://twitter.comfitgintljet> <http://www.facebook.com/intljet>
2221S=ithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=:p>
3
EFTA_R1_01567780
EFTA02461625
ℹ️ Document Details
SHA-256
7323bc21b3b3988d734c266e20e4bc4ae808e3ce63f258eb2c62c21ef9c37c91
Bates Number
EFTA02461623
Dataset
DataSet-11
Document Type
document
Pages
3
Comments 0