📄 Extracted Text (140 words)
EFTA01657961
Securing Plan
• Clearing Teams assigned to this operation will arrive on Little Saint James on
August 12, 2019
• Clearing Teams will arrive at the dock located on the North West Tip of the
Island
• For the purpose of clearing and securing the Island, the Island will be broken up
into 4 zones
• There will be a total of 4 Teams assigned to clearing and securing the island
• Each zone will have a designated Team assigned to clearing and securing
their zone
• The Team Leader for each team will be responsible for labeling each structure,
and documenting the location of the structure.
EFTA01657962
Little Saint James Island
HE
EFTA01657963
Zones
James Island
• Ledges Of- Little St Jcim
EFTA01657964
EFTA01657965
EFTA01657966
Zone 3
EFTA01657967
Zone 4
10
Ledges of Latle St Jamec •
EFTA01657968
ℹ️ Document Details
SHA-256
73ba4e4363045f476c7decace72bc91fd01c513beee5e720cb10d5ea02bf38fe
Bates Number
EFTA01657961
Dataset
DataSet-10
Document Type
document
Pages
8
Comments 0