📄 Extracted Text (285 words)
RMC Electric-Randy Morales
P 0 Box 10645
Albuquerque NM 87184
Phone: 505-342-0800
Fax: 505-342-0811
Estimate/Bid
June 18, 2012
Ann: Brice
To: Zorro Ranch
Job: Well K Estimate
1) 300ft of 2" PVC 202.00
2) 2-2" LB 20/ea 40.00
3) 1- 2 pole, 100 amp breaker 150.00
4) 1- 100 amp main breaker indoor panel 200.00
5) 3- 300ft runs of 1/0 copper Thhn wire 2,750.00
6) 1- 300ft run #2 copper Thhn ground 360.00
7) Miscellaneous fittings 250.00
Materials 3,952.00
Labor 3,560.00
$7,512.00
Note:
1) Digging for 100amp circuit from meter to well is excluded from price
2) Well control wiring not included in price
Option 1) If 480volt, 3 phase motor is used, add this amount to above price
20HP 3 sub add-a-phase 9,300.00
Labor & materials to install 900.00
Must be within 10ft of well motor starter
Freight cost will be added to price and is to be determined
Option 2) 480 Volt single phase
1) One 250 amp, 480 volt single phase panel 300.00
2) One 250 amp main breaker kit 260.00
3) One 75KVAA step up transformer 240 to 480 3,050.00
4) Miscellaneous material to install transformer and
connect to well motor starter 390.00
5) Labor to install and connect 900.00
Change orders will apply if extra work is needed varying from the above stated.
Any alteration or deviation from the above specifications will involve extra costs and written order and will become an
extra charge over and above the estimate. All agreements are contingent upon anything beyond our control
Acceptance of Proposal
The above prices. specification and conditions are satisfactory and are hereby accepted. RMC Electric is authorized
to do the work as specified.Date: Signature:
Thank you -Randy Morales.
EFTA01124871
ℹ️ Document Details
SHA-256
73c56de1b8bab54d6afdfb929ad3584034344b582dd6d209b89f0c2665bfe8d2
Bates Number
EFTA01124871
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0