Work Order Snapshot Work Order # 15174 Aircraft N62MS
1 ADMINISTRATIVEITEMS
1 1 AIRCRAFT FLIGHT LOG (AFL) DATA EXTRACTION, REQUIRED AFL MAINTENANCE ENTRIES AND ISSUANCE OF Completed
MAINTENANCE/AIRWORTHINESS RELEASE (FAR 43.9, 43.11OR 135.443, AS APPLICABLE).
Resolution FOR BILLING PURPOSES ONLY.
1 2 GENERATION OF REQUIRED MAINTENANCE LOGBOOK ENTRIES FOR AIRFRAME, ENGINES AND AUXILIARY Completed
POWER UNIT, AS APPLICABLE.
Resodition FOR BILLING PURPOSES ONLY.
1 3 PROCESSING OF COMPLETED WORK INSTRUCTION CARDS WITH THE CUSTOMER'S MAINTENANCE TRACKING Completed
PROVIDER FOR ALL MAINTENANCE ACTIVITIES (FAR 91.417 OR 135.439, AS APPLICABLE).
Resolution FOR BILLING PURPOSES ONLY.
1 4 MISC. MATERIAL / WASTE DISPOSAL FEE Completed
Resolution BILLING ONLY
2 CUSTOMER REQUESTED MAINTENANCE
2 1 COMPLY WITH PRELIMINARY INSPECTION AS REQUIRED BY FAR 145.211(c) (1) (i). Completed
Resolution COMPLIED WITH A LIMITED PRELIMINARY INSPECTION AS REQUIRED BY FAR 145.211(c) (1) (ii). NO DEFECTS NOTED.
2 2 MAINTENANCE SUPERVISION REVIEW OF "TOOLING and MATERIAL ACCOUNTABILITY FORM(S) - FORM 1610" Completed
IS REQUIRED TO VERIFY COMPLETENESS OF ALL FORMS BEFORE AIRCRAFT CAN BE RELEASED TO SERVICE.
Resolution REVIEWED THE TOOLING FORM 1810 FORM FOR COMPLETENESS.
2 3 UPON COMPLETION OF MAINTENANCE THE PERFORMANCE OF A WALK MOUND CHECK OF THE AIRCRAFT IS Completed
REQUIRED BY THE AUTHORIZED INSPECTOR APPROVING THE AIRCRAFT FOR RETURN TO SERVICE.
ReSauti0n COMPLIED WITH WALKAROUND INSPECTION.
2 4 COMPLY WITH MAINTENANCE RELEASE TASKS, IF REQUIRED. Completed
Resolution COMPLIED WITH MAINTENANCE RELEASE TASKS FOR RETURN TO SERVICE.
2 5 CHECK MAIN BATTERY STATE OF CHARGE PRIOR TO NEXT FLIGHT. Completed
Resolution CHECKED MAIN BATTERIES STATE OF CHARGE, BOTH BATTERIES 26.9 VOLTS.
2 6 UPDATE CMP CODE 346025 AND COMPLY WITH FMS NAV DATABASE UPDATE DUE 9-16-2015. Completed
DEFER PER GE CAPITALS MEL #34-15.1
Resolution TASK REMAINS DEFERRED.
2 7 COMPLY WITH 28 DAY ENGINE PRESERVATION RUN DUE 2-21-2016. Completed
Resolution TASK NOT DUE AT THIS TIME
1 RECORD APU HOURS AFTER 28 DAY ENGINE PRESERVATION RUN Completed
2 8 COMPLY WITH FAR 91.171(b)(1) 30 DAY VOR CHECK CMP CODE 345004 Completed
NEXT DUE: 2-19-2016
RECORD THE FOLLOWING INFORMATION IN THE RESOLUTION:
-BEARING TRANSMITTED
-BEARING ERROR #1
-BEARING ERROR #2
NOTE: THE INSPECTOR RELEASING THE AIRCRAFT WILL ENTER RESULTS IN THE AFL
Resolution COMPLY WITH FAR 91.171(bX1) 30 DAY VOR CHECK CMP CODE 345004
NEXT DUE: 3-1-2016
BEARING TRANSMITTED: 360 DEGREES
BEARING ERROR #1: 0
-BEARING ERROR #2: 0
Monday, Mitch 21, 2016 Page 1 of 2
EFTA01074549
Work Order Snapshot Work Order # 15174 Aircraft N62MS
2 9 COMPLY WITH A POSTFLIGHT INSPECTION. Completed
TIRE GAUGE
Resolution COMPLIED WITH POSTFLIGHT INSPECTION JAW GV-SP (550) PFC.PLC (7/2012) FORM.
APU HRS: 1863
TIRE GAUGE: 850205
2 10 UPDATE CMP CODE 274202 AND COMPLY WITH HORIZONTAL STABILIZER ACTUATOR - LUBRICATION. DUE Completed
31-2016.
Resolution UPDATED AND COMPLIED CMP CODE 274202 AND COMPLY WITH HORIZONTAL STABILIZER ACTUATOR - LUBRICATION.
1 UPDATE MD COMPLY CMP CODE 274202 AND COMPLY WITH HORIZONTAL STABILIZER ACTUATOR - LUBRICATION. Completed
2 INSTALL PANEL 3378R ON HORIZONTAL/VERTICAL STAB AFTER SEALANT CURES ON PANEL 32231. Completed
3 TOUCH UP PAINT AS REQUIRED Completed
2 11 COMPLY WITH AN INTERIOR AND EXTERIOR TOUCH UP AND HAND CLEAN WHEELS, GEARS AND DOORS AFTER Completed
EXERCISE FLIGHT.
RegthitiOn COMPLIED WITH AN INTERIOR AND EXTERIOR TOUCH UP AND HAND CLEAN WHEELS, GEARS AND DOORS AFTER
EXERCISE FLIGHT.
2 12 COMPLY WITH INSTALLING/ REMOVING ENGINE COVERS AND PITOT TUBE COVERS AS NEEDED FOR OUTSIDE Completed
STORAGE( TOUCH UP INTERIOR,(DUST EXTERIOR), PAINT TOUCH UP, SERVICE LAV AND FILL WATER SYSTEM
AS REQUESTED BEFORE DEPARTURE.
ReSORMOn COMPLIED WITH.
2 13 LEFT HORIZONTAL LOGO LIGHT INOP Completed
Resolution REMOVED AND REPLACED LEFT HORIZONTAL LOGO LIGHT WITH NEW/SAME P/N 1987 LAW GSSO t 334401. OPS
TEST GOOD AT THIS TIME
1 NEED TO SEAL AND PAINT TOUCH UP PANEL ON TOP OF HORIZONTAL STAB ABOVE LOGO LIGHT. (MARKED WITH Completed
RED TAPE)
2 REMOVE ACCESS PANEL, REPLACE LAMP WITH NEW P/N 1987, INSTALL ACCESS PANEL Completed
3 E.I.E. Completed
2 14 COMPLY WITH TOUCH UP CLEANING AFTER MAINTENANCE AND BEFORE EXERCISE FLIGHT Completed
Resolution COMPLIED WITH TOUCH UP CLEANING AFTER MAINTENANCE. ALSO DUSTED OFF BOTH WINGS, CLEANED EXTERIOR
WINDOWS. CLEANED WHEELS GEARS AND DOORS
Monday, Mitch 21, 2016 Page 2 oft
EFTA01074550
1 ADMINISTRATIVEITEMS
1 1 AIRCRAFT FLIGHT LOG (AFL) DATA EXTRACTION, REQUIRED AFL MAINTENANCE ENTRIES AND ISSUANCE OF Completed
MAINTENANCE/AIRWORTHINESS RELEASE (FAR 43.9, 43.11OR 135.443, AS APPLICABLE).
Resolution FOR BILLING PURPOSES ONLY.
1 2 GENERATION OF REQUIRED MAINTENANCE LOGBOOK ENTRIES FOR AIRFRAME, ENGINES AND AUXILIARY Completed
POWER UNIT, AS APPLICABLE.
Resodition FOR BILLING PURPOSES ONLY.
1 3 PROCESSING OF COMPLETED WORK INSTRUCTION CARDS WITH THE CUSTOMER'S MAINTENANCE TRACKING Completed
PROVIDER FOR ALL MAINTENANCE ACTIVITIES (FAR 91.417 OR 135.439, AS APPLICABLE).
Resolution FOR BILLING PURPOSES ONLY.
1 4 MISC. MATERIAL / WASTE DISPOSAL FEE Completed
Resolution BILLING ONLY
2 CUSTOMER REQUESTED MAINTENANCE
2 1 COMPLY WITH PRELIMINARY INSPECTION AS REQUIRED BY FAR 145.211(c) (1) (i). Completed
Resolution COMPLIED WITH A LIMITED PRELIMINARY INSPECTION AS REQUIRED BY FAR 145.211(c) (1) (ii). NO DEFECTS NOTED.
2 2 MAINTENANCE SUPERVISION REVIEW OF "TOOLING and MATERIAL ACCOUNTABILITY FORM(S) - FORM 1610" Completed
IS REQUIRED TO VERIFY COMPLETENESS OF ALL FORMS BEFORE AIRCRAFT CAN BE RELEASED TO SERVICE.
Resolution REVIEWED THE TOOLING FORM 1810 FORM FOR COMPLETENESS.
2 3 UPON COMPLETION OF MAINTENANCE THE PERFORMANCE OF A WALK MOUND CHECK OF THE AIRCRAFT IS Completed
REQUIRED BY THE AUTHORIZED INSPECTOR APPROVING THE AIRCRAFT FOR RETURN TO SERVICE.
ReSauti0n COMPLIED WITH WALKAROUND INSPECTION.
2 4 COMPLY WITH MAINTENANCE RELEASE TASKS, IF REQUIRED. Completed
Resolution COMPLIED WITH MAINTENANCE RELEASE TASKS FOR RETURN TO SERVICE.
2 5 CHECK MAIN BATTERY STATE OF CHARGE PRIOR TO NEXT FLIGHT. Completed
Resolution CHECKED MAIN BATTERIES STATE OF CHARGE, BOTH BATTERIES 26.9 VOLTS.
2 6 UPDATE CMP CODE 346025 AND COMPLY WITH FMS NAV DATABASE UPDATE DUE 9-16-2015. Completed
DEFER PER GE CAPITALS MEL #34-15.1
Resolution TASK REMAINS DEFERRED.
2 7 COMPLY WITH 28 DAY ENGINE PRESERVATION RUN DUE 2-21-2016. Completed
Resolution TASK NOT DUE AT THIS TIME
1 RECORD APU HOURS AFTER 28 DAY ENGINE PRESERVATION RUN Completed
2 8 COMPLY WITH FAR 91.171(b)(1) 30 DAY VOR CHECK CMP CODE 345004 Completed
NEXT DUE: 2-19-2016
RECORD THE FOLLOWING INFORMATION IN THE RESOLUTION:
-BEARING TRANSMITTED
-BEARING ERROR #1
-BEARING ERROR #2
NOTE: THE INSPECTOR RELEASING THE AIRCRAFT WILL ENTER RESULTS IN THE AFL
Resolution COMPLY WITH FAR 91.171(bX1) 30 DAY VOR CHECK CMP CODE 345004
NEXT DUE: 3-1-2016
BEARING TRANSMITTED: 360 DEGREES
BEARING ERROR #1: 0
-BEARING ERROR #2: 0
Monday, Mitch 21, 2016 Page 1 of 2
EFTA01074549
Work Order Snapshot Work Order # 15174 Aircraft N62MS
2 9 COMPLY WITH A POSTFLIGHT INSPECTION. Completed
TIRE GAUGE
Resolution COMPLIED WITH POSTFLIGHT INSPECTION JAW GV-SP (550) PFC.PLC (7/2012) FORM.
APU HRS: 1863
TIRE GAUGE: 850205
2 10 UPDATE CMP CODE 274202 AND COMPLY WITH HORIZONTAL STABILIZER ACTUATOR - LUBRICATION. DUE Completed
31-2016.
Resolution UPDATED AND COMPLIED CMP CODE 274202 AND COMPLY WITH HORIZONTAL STABILIZER ACTUATOR - LUBRICATION.
1 UPDATE MD COMPLY CMP CODE 274202 AND COMPLY WITH HORIZONTAL STABILIZER ACTUATOR - LUBRICATION. Completed
2 INSTALL PANEL 3378R ON HORIZONTAL/VERTICAL STAB AFTER SEALANT CURES ON PANEL 32231. Completed
3 TOUCH UP PAINT AS REQUIRED Completed
2 11 COMPLY WITH AN INTERIOR AND EXTERIOR TOUCH UP AND HAND CLEAN WHEELS, GEARS AND DOORS AFTER Completed
EXERCISE FLIGHT.
RegthitiOn COMPLIED WITH AN INTERIOR AND EXTERIOR TOUCH UP AND HAND CLEAN WHEELS, GEARS AND DOORS AFTER
EXERCISE FLIGHT.
2 12 COMPLY WITH INSTALLING/ REMOVING ENGINE COVERS AND PITOT TUBE COVERS AS NEEDED FOR OUTSIDE Completed
STORAGE( TOUCH UP INTERIOR,(DUST EXTERIOR), PAINT TOUCH UP, SERVICE LAV AND FILL WATER SYSTEM
AS REQUESTED BEFORE DEPARTURE.
ReSORMOn COMPLIED WITH.
2 13 LEFT HORIZONTAL LOGO LIGHT INOP Completed
Resolution REMOVED AND REPLACED LEFT HORIZONTAL LOGO LIGHT WITH NEW/SAME P/N 1987 LAW GSSO t 334401. OPS
TEST GOOD AT THIS TIME
1 NEED TO SEAL AND PAINT TOUCH UP PANEL ON TOP OF HORIZONTAL STAB ABOVE LOGO LIGHT. (MARKED WITH Completed
RED TAPE)
2 REMOVE ACCESS PANEL, REPLACE LAMP WITH NEW P/N 1987, INSTALL ACCESS PANEL Completed
3 E.I.E. Completed
2 14 COMPLY WITH TOUCH UP CLEANING AFTER MAINTENANCE AND BEFORE EXERCISE FLIGHT Completed
Resolution COMPLIED WITH TOUCH UP CLEANING AFTER MAINTENANCE. ALSO DUSTED OFF BOTH WINGS, CLEANED EXTERIOR
WINDOWS. CLEANED WHEELS GEARS AND DOORS
Monday, Mitch 21, 2016 Page 2 oft
EFTA01074550