👁 1
💬 0
📄 Extracted Text (272 words)
From: Richard Kahn <
Sent: Monday, March 11, 2013 9:04 PM
To: Jeffrey Epstein
Subject: Fwd: Zorro Fiber ITC
Attachments: ZDC_FIBREJTC_120412.pdf, Untitled attachment 00214.htm
total cost with tax =17,546.08
materials =6,577.51
labor 53,665.00
tax =span class="Apple-tab-span" style="white-space:pre"> =/span>7,303.57
i have not yet negotiated =is price lower and worth stated he thinks if we wanted to save =oney we could use a 1.25"
ducts vs 2.0"
brice has not yet =iven me his feedback on our conversation with worth last =eek
i am 100% confident that ITC is the proper =endor for the job and we probably can get 5-7% off original =uote
ITC bid did not break down individual =aterial costs attached are links for fiber and duct =hat were in quote:
http://store.cables=lususa.comiap0061anr.htmI
http://store.cab=esplususa.com/2b125sminscw.htmI
please =dvise
=div>
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue, 4th Floor,
Begin forwarded message:
From: brice gordon
Date: December 4, 2012 9:56:21AM EST
To: Rich Kahn
EFTA_R1_01985267
EFTA02679806
Subject: Zorro Fiber =TC
Rich
attached is the =stimate from ITC for the install of Fiber at Zorro Ranch
I =ave not fully reviewed yet, but thought it best to forward to you as =effrey is very interested in this project.
please note, Bruce Chavez bid will go down slightly as I have taken =way landlines to the houses at ranch central
with a good =ireless infrastructure cell phone should cover them. It also is a =avings by not running wire to each
location.
The main difference in this bid vs Rich's bid is =onduit,
please review and lets discuss pro and cons =omorrow if thats OK
=br>
Brice Gordon
USVI
Phone
New =exico
Phone
2
EFTA_R1_01985268
EFTA02679807
ℹ️ Document Details
SHA-256
75c669146cd3661e9e5d1f059460573233bcedf12f85c8ad970ae1e726b7309c
Bates Number
EFTA02679806
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0