📄 Extracted Text (1,123 words)
From: jeffrey E. <[email protected]>
Sent: Monday, August 3, 2015 1:21 PM
To: LAllenby; Richard Kahn
Subject: Re: LS1 Plate Work
that is only the problem„ is there a pr=posal for solution, ? please try to add action steps to =ssues, telling me only
that there is a problem is time c=nsumig
wrote:
The hul= is compromised - rusted through in areas on his map.
Leight=n Allenby
Director of Pro erties
On Aug 3, 2015, at 9:09 AM, Richard K=hn
wrote:
Bosco email off point. Disappointed with bosco on every step of this=barge overhaul and concerned he
is not best person to care for and operate=moving forward. To many surprises and then an excuse and disclaimer each
t=me. As I am sure you will say we have no choice I wanted to confirm we sha=l proceed with latest Change order for
47,390
Ple=se advise
Thank you
Sent from my iPhone
ar>Begin forwarded message:
=rom: Leighton Allenby
Date: July 31, 2015 at 3:4=:39 PM EDT
To: Richard Kah
FYI
EFTA_R1_01615862
EFTA02492881
=eighton Allenby
Director of Properties
Forwarded messa e
F=om: Bill Hague
Date: Fri, Jul 31, 2015 at 3:09 PM
Understood.
Gabe, one of his hands an= I went over all the remaining cavities/compartments and found
only a half=dozen minor and repairable spots in the hull plating. The bulkheads show s=aggered severe pits/holes that
also can be dealt with reasonably.
4>=AO I agree about the surveyor.
Also, your email ended up in my ju=k mail. I have added you to my contacts to avoid that in the
future. I reg=et the delay in responding.
For your information, I contac=ed a Navy colleague and asked for the present contractors
information conc=rning construction of the latest Navy LCM8's
I did thi= to quantify your question about replacement costs of the Barge. I was Ref=red to
Kvichak Marine in Seattle. Art Parker there said my gues= of 2 million is likely low. A build that heavy is likely a 3 to 4
million=dollar job in his opinion. His company is bidding on the Caiman design 60 =nd 70 for the USN.
Good Day
Bo=coe
From:
Date: ri, u
Subje=t: Re: LSJ Plate Work
To: [email protected] <mailto:[email protected]> ;
Hello Ann= and Boscoe,
Can you please go over every inch of Big D and dete=mine when the bleeding to Mr.
Epstein is going to stop.
I know I=am coming in late in the last quarter but there should have been a survey
=ecommended so this
additional work outside of the original=budget did't occur and a 10 to 15% mic added
for unforeseen. I see no =ther option but to
2
EFTA_R1_01615863
EFTA02492882
recommend to Mr. Epstein and Richard that thi=
work be completed. Please thank Gabriel for the savings on the =ay days
Mr. Epstein and R=chard,
I this additional $47,390 =xpenditure approved?
adiv>
Best,
Leighton
<=div>
Good Morning Anna-
Upon reviewing and inspecting the in=ide of the compartments, forward of the
engine room, we have come up with = quotation
for repairing all the "wasted" plate. Appro=imately 160 square feet of plate has
to be cut out and replaced. The squar= footage equals
848LBS x $45 per pound the total would be $38,16= (This price includes all labor
and material). We will also have to remove=both keel
coolers due to their location with the plate that has =o be cut out. We will also
have to fabricate two new boxes in which they s=t and
then remount these boxes once the new plate is welde= into place. The price
for this is $5850 includes labor and material. Two =ater
tight bulkheads are also compromised and several area= will need to be
"cropped" out and replaced. Labor and materials=is $3380.
We will also "plug weld" 12 more addit=onal areas that have deteriorated and
need to be addressed. These two comp=rtments have
been inspected by both Gabriel, the project m=nager, and Bosco. In addition,
the emergency bilge pump system needs =o be renewed
and it is our recommendation to have Bos=o undertake this job. Please note
that we have not charged any additional =ay days and
will continue not to. The areas that need to b= cut out and replaced are very
confined and difficult to work in.40=A0With the savings on lay
days it is over $3500 so we=will not be able to move on our final quotation. I
have also attached a fe= pictures
Total for =abor and material $47,390
Leighton Allenby
Director of Pro=erties
On Fri, Jul 31, 2015 at 11:43 AM,
rote:
Ann R.
3
EFTA_R1_01615864
EFTA02492883
Begi= forwarded message:
Date: Jul 31, 2015 at 11:19:19 AM AST
MOM=
Good Morning Anna-
Upon revi=wing and inspecting the inside of the compartments, forward of the
engine =oom, we have come up with a quotation for repairing all the "wasted&q=ot; plate. Approximately 160 square
feet of plate has to be cut out and re=laced. The square footage equals 848LBS x $45 per pound the total would
be=$38,160 (This price includes all labor and material). We will also have to=remove both keel coolers due to their
location with the plate that has to =e cut out. We will also have to fabricate two new boxes in which they sit =nd then
remount these boxes once the new plate is welded into place. The p=ice for this is $5850 includes labor and material.
Two water tight bulkhea=s are also compromised and several areas will need to be "cropped&quo=; out and replaced.
Labor and materials is $3380. We will also "plug =eld" 12 more additional areas that have deteriorated and need to be
a=dressed. These two compartments have been inspected by both Gabriel, the project manager, and Bosco. In addition,
the emergency bilge pump syste= needs to be renewed and it is our recommendation to have Bosco under=ake this job.
Please note that we have not charged any additional lay days=and will continue not to. The areas that need to be cut out
and replaced a=e very confined and difficult to work in. With the savings on la= days it is over $3500 so we will not be
able to move on our final qu=tation. I have also attached a few pictures
Total for labor and material = $47,390
<resized8.jpg><resized10.j=g><resized12.jpg>
ablockquote>
=blockquote>
4
EFTA_R1_01615865
EFTA02492884
<resizedl2.jpg>
&=t;resized10.jpg>
<=span>
=C2* please note
The information co=tained in this communication is
confidential, may be attorney-client pr=vileged, may
constitute inside information, and is intended only for
JEE
Unauthorized use= disclosure or copying of this
communication or any part thereof is str=ctly prohibited
and may be unlawful. If you have received this
commu=ication in error, please notify us immediately by
return e-mail or by e=mail to [email protected] <mailto:[email protected]> , and
destroy this communication and all copies thereo=,
including all attachments. copyright -all rights reserved
</=iv>
5
EFTA_R1_01615866
EFTA02492885
ℹ️ Document Details