EFTA00801811.pdf

DataSet-9 1 page 244 words document
👁 1 💬 0
📄 Extracted Text (244 words)
Subbase Drydock Estimate T:(340) 776-2078 Fax:(340)779-8426 PO Box 4429/ Parcel 162 Subbase Date Estimate # 5:3/2017 SS7 Name / Address LSJ,LLC "Big N" Anna: ■ Terms Project Upon Comple... "Big N" Description Qty Cost Total Drydock hauling fees I 1,500.00 1,500.00 Blocking Fee I 350.00 350.00 Laydays: per day I 350.00 350.00 Electricity Fee: per day I 50.00 50.00 Sand, prep, paint -- SBDD recommends the anti-fouling during repairs. We will keep the same I 7,500.00 7,500.00 price as two years ago. Sand, spot prime, apply two coats of antifouling with a third around the waterline: Good afternoon Anna, Bosco sent me a picture of the Stbd Shaft and after review I told Bosco that the vessel needs to be hauled and the running gear removed and examined and at that time a determination of the correct repair procedure be presented to you. Please keep in mind that the Stbd engine was removed for repairs and that SBDD was not involved in this project. The correct alignment of the drive train is critical for long service life, every week a thorough check of the vessel should be preformed. As recommended a full time captain should be employed on Big "N" and check list should be followed . The video of the shaft looses in the coupling should never have gotten to this point of neglect. Please advise if you would like to move forward with the estimate. Thank you. Total y),- ;o.liti Signature EFTA00801811
ℹ️ Document Details
SHA-256
76ffb3a3a00f98f0e96ab98ccdf57adb6350f1d5f0434ae234424a657b0d6243
Bates Number
EFTA00801811
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!