EFTA02288319
EFTA02288320 DataSet-11
EFTA02288323

EFTA02288320.pdf

DataSet-11 3 pages 416 words document
P17 V16 P19 P23 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (416 words)
To: From: Sent: e : : Subject: Re: Schedule Ok thank you John!! Sent from my iPhonc On May 29, 2019, at 3:3I PM wrote: Hi Please find a tentative schedule for the projects as requested. The impendin r in has chap ed m schedule drastically. I have to run now to take my and running late. if you find any time line error that is the reason why. I need to go through the schedule again but this is a start. Regards John Original Message Subject: Re: Shade Structure/En ineerin Doors Bid (LSJ/GSJ) From: Date: Tue, May 28, 2019 3:53 am To: John Bedminster Cc: Mike Glidden •, ich Kahn HI John...thank you so much for these quotes..Jeffrey is asking for the timing of the projects please...wh start and when is projected completion date. thanks! On Ma 25 2019 at 11:00 PM, wrote: Hello Please find attached the proposal for the Shade Structure and the installation of doors at the engineering building. Have a wonderful weekend. Regards John Original Message Subject: Re: Shade Structure En ineerin Doors Bid (LSJ/GSJ) From: EFTA_R1_01116506 EFTA02288320 Date: Wed, May 22, 2019 6:56 pm To: John Bedminster Cc: Mike Glidden Daphne Wallace uez , Rich Kahn Hello John and thank you for your reply! We look forward to receiving your quote by Saturday for the Shade Structure and Engineering Doors... On Ma 22, 2019, at 8:41 PM, wrote: HI Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on St. John in the morning and may not have phone service. If any thing please send a text. Best Wishes John Original Message Subje En rin• D r Bi. L GSJ) From: Dat- :4. pm To: Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to me as soon as possible with this bid? Also wondering about the bid for the engineer doors? EFTA_R1_01116507 EFTA02288321 Please let me know! nTha LSJ/GSJ Sent from my iPhone <LSJ-Engineering bldg.pdf> <LSJ-Shade structure.pdf> <LSJ-Pool Shade Structure & Engineering-constriction schedule -May 29 20 I 9.pdf> EFTA_R1_01116508 EFTA02288322
ℹ️ Document Details
SHA-256
77347b3cf2dc44022bddcfd2389c45971cf8e7dcf1595819ccf3e0fcbb86b78a
Bates Number
EFTA02288320
Dataset
DataSet-11
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!