On May 29, 2019, at 3:3I PM wrote:
Hi
Please find a tentative schedule for the projects as requested. The impendin r in
has chap ed m schedule drastically. I have to run now to take my
and running late. if you find any time line error that
is the reason why. I need to go through the schedule again but this is a
start.
Regards
John
Original Message
Subject: Re: Shade Structure/En ineerin Doors Bid (LSJ/GSJ)
From:
Date: Tue, May 28, 2019 3:53 am
To: John Bedminster
Cc: Mike Glidden •, ich Kahn
HI John...thank you so much for these quotes..Jeffrey is asking for the timing
of the projects please...wh start and when is projected
completion date. thanks!
On Ma 25 2019 at 11:00 PM,
wrote:
Hello
Please find attached the proposal for the Shade Structure and the
installation of doors at the engineering building.
Have a wonderful weekend.
Regards
John
Original Message
Subject: Re: Shade Structure En ineerin Doors Bid (LSJ/GSJ)
From:
EFTA_R1_01116506
EFTA02288320
Date: Wed, May 22, 2019 6:56 pm
To: John Bedminster
Cc: Mike Glidden Daphne Wallace
uez
, Rich
Kahn
Hello John and thank you for your reply! We look forward to
receiving your quote by Saturday for the Shade
Structure and Engineering Doors...
On Ma 22, 2019, at 8:41 PM,
wrote:
HI
Sorry about the late response, I was pouring concrete today.
I am working on preliminary layout to
determine all possible aspect of the
shade structure located at the flag pole
and pool area. I should be able to
deliver the estimate(s) by Saturday the
latest. Please let me know if that is
okay with you. I will be on St. John in
the morning and may not have phone
service. If any thing please send a text.
Best Wishes
John
Original Message
Subje En rin• D r Bi. L GSJ)
From:
Dat- :4. pm
To:
Hello Mr Bedminster. I would like to follow up on the
bid you are to propose for the
shade structure located at the
flag pole pool Mike Glidden has
shown you on our island. Can
you please get back to me as
soon as possible with this bid?
Also wondering about the bid for the engineer doors?
EFTA_R1_01116507
EFTA02288321
Please let me know!
nTha
LSJ/GSJ
Sent from my iPhone
<LSJ-Engineering bldg.pdf> <LSJ-Shade structure.pdf>
<LSJ-Pool Shade Structure & Engineering-constriction schedule -May 29
20 I 9.pdf>
EFTA_R1_01116508
EFTA02288322
ℹ️ Document Details
SHA-256
77347b3cf2dc44022bddcfd2389c45971cf8e7dcf1595819ccf3e0fcbb86b78a
Bates Number
EFTA02288320
Dataset
DataSet-11
Document Type
document
Pages
3
Comments 0