📄 Extracted Text (3,927 words)
To: Lvje
From:
Sent: Mon 3/24/2014 8:43:46 PM
Subject: Re: updates
Hi Larry...
-so do I keep the June 30th date in the calendar for the 24 month inspection of the plane? or do I
take this out? (or does JE have no choice!?)
-sounds like a midnight departure won't work for JE on April 4?
-the charter on the 31st would be for Mariana (shhhhh) departing Warsaw through Paris and on to
St. Maarten...we may need a charter to get her back to St. Maarten on April 19th...not sure...
On Mar 24, 2014, at 4:37 PM, Lvjet c wrote:
I ment to include you both on this email to Jeffrey, It appears he was not please or surprised
when I informed him of the 24 month inspection that is due in 90 days June 30th, so I sent
Jeffrey the DUE fist that I review every week, (sometimes).
***-also, JE wanted to depart ST THOMAS at midnight April 4th to arrive in Phoenix to clear
customs,. flight time is 7+10min., that would have us land in PHX at 5am,.. however. Customs
is open only, 830am to 4:30pm for hours of operation.
JE wants a small plane charter for March 31st, St Martaan to St Thomas, maybe they are
arriving on airlines from EU?
SEE update to JE below,
thx
Larry
-----Ori inal Messa e—
From: Lvjet
To: jeevacation <jeevacationacimail.com>
Sent: Mon, Mar 24, 2014 4:28 pm
Subject: Re: updates
Jeffrey.
PHX Customs flight OK,. April 4th ?
Customs is not enforcing Overflight, as long as operator has obtained Overflight in the past, (as we
have), we are allowed to fly into any AOE (Airport of Entry). with prior approval.
Phoenix Customs hours of operation Monday - Friday 8:30am - 4:30pm only, no overtime according
to officer on duty.
Phoenix will approve overflight after they review passengers listed on EAPIS for this flight on April 4th
and we must land between the hours of 8:30am and 4:30pm Monday - Friday.
OUTFLOW Valve:
Gulfstream Tech ops has to locate in their archives the original drawings for our GIV serial number,
1085, this has been our delay in getting an answer and or approval, whether Gulfstream will
use other installation drawings or fabricate New ones for procedure to install new louvers,.
I have contacted Rusty Crammer our DU885 Sales Rep, to assist with pushing Gulfstream to give an
answer regarding installing other style outflow valve louvers,
CHARTER St. Martaan to St Thomas March 31st, 2014
St Thomas Jet Center Charter has Twin Engine Piper Navajo Panther, (similar to our past Cessna
421).
price St. Martaan to St Thomas $1,920.00 all fees and Handling included.
EFTA_R1_00730564
EFTA02110465
Guy Due list below with dates,.
Below is my due list for Gulfstream IV that will take me thru November 2014,. calendar items and
inspections are sometimes hidden in these reports,. many items are complied with during
routine Mx visits to Teterboro and Islip to keep the GIV operating as smooth as possible. In the
future I will give a minimum of 12 month warning of impending inspections that will come due,
so we can address Mx scheduling properly,
Select a compliance function:
Click Here to Select Function
GoTo: ATA Code Management
GoTo: LogBook/MTR Entry for Checked Items
GoTo: Maintenance Due List
RPT: Airframe Times Due List (ATA Code w Rel)
RPT: Airframe Times Due List (ATA Code)
RPT: Airframe Times Due List (Due Date w Rel)
RPT: Airframe Times Due list (Due Date)
RPT: Airframe Times Due List By Grow (ATA Code)
RPT: Airframe Times Due List By Group (Due Date)
RPT: Component Transaction (Part Rem) for Checked
RPT: Current Status of Checked Items
RPT: Due List (ABS)
Aircraft Due List: Ordered by next due based on RPT: Due List with Projected Due Date (ATA Code)
RPT: Due List with Projected Due Date (Due Date)
utilization RPT: Excel Output for Checked Items
RPT: Maint Quote Related (Excel) for Checked
RPT: Maint Quote Related for Checked
RPT: Maintenance Due List (ATA Code)
RPT: Maintenance Due list (Due Date)
RPT: Maintenance Due List (STD)
RPT: Maintenance Due List By Mrs/eye/Date (STD)
RPT: Maintenance Quote (Excel) for Checked Items
RPT: Maintenance Quote (STD) for Checked Items
RPT: Mechanic Signoff (ABS) for Checked Items
RPT: Mechanic Signoff (STD) for Checked Items
RPT: Mechanic Signoff With Related for Checked
RPT: Parent Child Signoff for Checked Items
RPT: Status Summary (STD) Of Checked Items
RPT: Task Card Package for Checked Items
Updating Due and Remains Information ... Please Wait
Retrieving data ... Please Wait
Includes recurring and mandatory service information that have not been accomplished
All related codes due within the projection are included
Projected Through Hours:8802.5 Landings:4057 Date:28 Nov 2014
Delta
Select All Checkboxes j Do-select All Checkboxes
cw ATA Code Logbook Description Compliance Interva
353012 (P) Airframe Oxygen Bottle. #2 Portable - Removal / 18C, !.I,
Installation Due: End
PIN: 176965-S-M-B-3 SIN: 672761 Of Month
Custom
Frequenc
y
EFTA_R1_00730565
EFTA02110466
M 262562 (P) Airframe Portable H2O Fire Extinguisher (Aft Cabin) - '.' OS
Hydrostatic Test Due:
End Of
Month
262631 (P) Airframe Portable Halon Fire Extinguisher (Right Cockpit)
Inspection Toleranc
e
+15 DAY
Due: End
Of Month
H 262632 (P) Airframe Portable Halon Fire Extinguisher (Forward Cabin) -
Inspection Toleranc
+15 DAY
Due: End
Of Month
NI 262633 (P) Airframe Portable Halon Fire Extinguisher (Aft Cabin) -
Inspection Toleranc
e
+15 DAY
Due: End
Of Month
X 320004 Airframe Main Landing Gear (Left) - Lubrication
Tolerant
+15 DAY
Due: End
Of Month
320005 Airframe Main Landing Gear (Right) - Lubrication
Toleranc
+15 DAY
Due: End
Of Month
EFTA_R1_00730566
EFTA02110467
320006(P) Airframe Nose Gear - Lubrication 4 Iii
Tole
+15 DA
Due:
Of
: : 240178 Airframe Battery #3. Emergency Service 6 MO
Custom
Frequent
243105(P) Airframe Battery. #1--Capacity Check 6 MO
PIN: RG-380E-44 SIN: 40336977 Tolerance
+1/-1
MOS
Custom
Frequent
Y A
12 MOS Ir
- 243106 (P) Airframe Battery, #2—Capacity Check 6 MO
P/N: RG-380E-44 SIN: 40494892
12 MOS Ir
346019 Airframe FMS No. 1 NDB - Update 28 .L7.
Tolerant
2
-8 DAY
346020 Airframe FMS No. 2 NDB - Update 28 .7,
Tolerant
e
-8 DAY
EFTA_R1_00730567
EFTA02110468
M 346021 Airframe FMS No. 3 NDB - Update 28 C
E 254001 (P) Airframe Lavatory Compartment Above Floor - Inspection 100(
El 994002 (P) Airframe A074-08-09 R3 Lavatory Paper and Linen 100(
Waste Receptacle Enclosure Access Door and
Disposal Door Inspection
:9 240260 (P) Airframe Emergency Securaplane Battery / Heater 481
Assembly No. 1 - Replacement
P/N: 160-0201-02 SIN: 1410
,..1304003 Airframe Windshield Wiper Lock Pin - Lubrication 6 IV
Adjustment
+15 DA I
Due: End
Of Month
N 323112 (P) Airframe Landing Gear Emergency Air Bottle - Hydrostatic 36 I
Test Due:
P/N: 1159SCH233-5 SIN: 12398C1 End Of
Month
:i 381010 Airframe Filter Element, No. 1 Potable Water System - 6 MC
Removal / Installation Due: End
P/N: 778000 SIN: Of Month
Custom
381025 (P) Airframe Potable Water System - Flush / Sanitize 6 MO:
Mina
Of Month
EFTA_R1_00730568
EFTA02110469
Custom
Frequent
N 539516 (P) Airframe Antenna Interface - Inspection 72 r..
Tolerant
+15 DAY
Due: End
Of Month
21314007 Airframe FWC No. 1 Trend and Limit Monitoring - Data 90 Di
Download
314008 Airframe FWC No. 2 Trend and Limit Monitoring - Data 90 Di
Download Custom
Frequent
340100 Airframe Reduced Vertical Separation Minimum (RVSM) 1000 HRS
Monitoring Policy 6 1,105 nu!
:•1262622 (P) Airframe Portable Halon Fire Extinguisher (Forward Cabin) -
Weight Check Tolerant
+15 DAY
Due: End
Of Month
H 262623 (P) Airframe Portable Halon Fire Extinguisher (Aft Cabin) - 12
Weight Check Tolerant
+15 DAY
Due: End
Of Month
EFTA_R1_00730569
EFTA02110470
N1521080 (P) Airframe Inflatable Door Seal - Purging Procedure 12 ts
M710019 (P) Engine 1 Powerplant Internal - Inspection 12
Z 710019 (710020) (P) Engine 2 Powerplant Internal - Inspection 12 ft
NI 100310* Airframe CK AIRWORTHY DIRECTIVES 3 t.
P/N:? SIN:
M 100320* Airframe CK SERVICE BULLETINS 3
P/N:? SIN: DUI
End
Mo
: 212077 (P) Airframe Air Conditioning Shut-off Valve Filter (Left) -
Inspection Tolerant
e
+15 DAY
Due: End
Of Month
tit 212078 (P) Airframe Air Conditioning Shut-off Valve Filter (Right) - 24 •
Inspection Tolerant
e
+15 DAY
EFTA_R1_00730570
EFTA02110471
Due: End
Of Month
0 212115 Airframe Nose Compartment Cooling System -
Operational Test Toleranc
e
+15 DAY
Due: End
Of Month
213053 Airframe Cabin Pressure Warning Indication System -
Functional Test Toleranc
+15•DAY
Due: End
Of Month
N 213081 (P) Airframe Pressurization Safety Valve - Inspection 24 P.
2 .
+15O
Due:
Of
0 213090 Airframe Cabin Pressure Controller (Manual Mode) - 24 P.
Operational Test Toleranc
+15•DAY
Due: End
Of Month
:- 216097 (P) Airframe Air Cycle Machine Compressor Outlet Overheat 24 N
Switch (Left) - Trip Point Check Toleranc
+15•DAY
Due: End
Of Month
N 216098 (P) Airframe Air Cycle Machine Compressor Outlet Overheat 24 N
Switch (Right) - Trip Point Check MSS
EFTA_R1_00730571
EFTA02110472
+15•DAY
Due: End
Of Month
: : 236010 (P) Airframe Static Discharger Wick (Left Wing) - Resistance 2L t•
Check Toleranc
e
+15 DAY
Due: End
Of Month
: : 236011 (P) Airframe Static Discharger Wick (Right Wing) -
Resistance Check Toleranc
+15•DAY
Due: End
Of Month
NI 236014 (P) Airframe Static Discharger Wick (Left Horizontal 24 r.
Stabilizer) - Resistance Check Toleranc
+15•DAY
Due: End
Of Month
Ili1236015 (P) Airframe Static Discharger Wick (Right Horizontal 24 is
Stabilizer) - Resistance Check nc
+15 DAY
Due: End
Of Month
■ 237041 (P) Airframe CVR Underwater Locator Beacon (DK100 /
DK120) - Operational Test Toleranc
PIN: DK120 SIN:
+15 •DAY
Due: End
Of Month
EFTA_R1_00730572
EFTA02110473
237047 (P) Airframe CVR Underwater Locator Beacon - Battery 24 MOS
Voltage Check (DK100 / DK120)
P/N: DK120 SIN:
: 251125 Airframe Pilot Copilot Inertia Reel - Operational Test 24 f.
Toleranc
e
+15 DAY
Due: End
Of Month
N 261035(P) Airframe Engine Alternator Overheat Switch (Left) - Trip
Point Check Tolerant
e
+15 DAY
Due: End
Of Month
:•. 261036 (P) Airframe Engine Alternator Overheat Switch (Right) - Trip 24 k
Point Check alma!
e
+15 DAY
Due: End
Of Month
261065 (P) Airframe Combined Hydraulic System Overheat Switch - 24 P.
Trip Point Check Toleranc
+15 DAY
Due: End
Of Month
261066(P) Airframe Flight Hydraulic System Overheat Switch - Trip
Point Check Toleranc
e
+15 DAY
Due: End
Of Month
EFTA_R1_00730573
EFTA02110474
261235 (P) Airframe Bleed Air Manifold Overheat Switch (Left) - Trip 24 MOS
Point Check
Ill 261236 (P) Airframe Bleed Air Manifold Overheat Switch (Right) - 24 ki
Trip Point Check Toleranc
e
+15 DAY
Due: End
Of Month
261440 (P) Airframe APU Overheat Switch - Trip Point Check
Toleranc
e
+15 DAY
Due: End
Of Month
El 262075 (P) Airframe Fire Bottle (APU) - Weight Check
Toleranc
e
+15 DAY
Due: End
Of Month
1262155 Airframe Fire Pull Handle - Operational Test
Toleranc
+15 DAY
Due: End
Of Month
IA 262165 (P) Airframe Fire Extinguisher System (Left) - Functional Test 24 F
+15 DAY
Due: End
Of Month
EFTA_R1_00730574
EFTA02110475
21262166 (P) Airframe Fire Extinguisher System (Right) - Functional 24 ti
Test
21262170 Airframe Fire Extinguisher System (APU) - Functional Test 24 ti
Tolerant
e
+15 DAY
Due: End
Of Month
: ! 303006 Airframe Standby Pitot Heat System - Operational Test
Toleranc
e
+15 DAY
Due: End
Of Month
M 303009 Airframe Total Temperature Probe Heat System -
Operational Test Toleranc
e
+15 DAY
Due: End
Of Month
303012 Airframe Angle of Attack Heat - Operational Test
Tolerant
e
+15 DAY
Due: End
Of Month
0 320010 (P) Airframe Landing Gear (Right Main) Corrosion Inhibiting 24 fi
Compound Reapplication
+15 DA1
Over'.
Fight,
EFTA_R1_00730575
EFTA02110476
Due: End
Of Month
igt 320034 (P) Airframe Nose Landing Gear Corrosion Inhibiting
Compound Reapplication Toleranc
e
+15 DAY
Over
Flight
Due: End
Of Month
321041 Airframe Main Gear Shock Absorber (Left) - Service
Toleranc
+15 DAY
Due: End
Of Month
321042 Airframe Main Gear Shock Absorber (Right) - Service
Toleranc
+15 DAY
Due: End
Of Month
322006 (P) Airframe Nose Gear Shock Strut - Friction Check
Toleranc
e
+15 DAY
Due: End
Of Month
:< 322028 Airframe Nose Gear Shock Strut - Service
Toleranc
+15 DAY
Due: End
Of Month
EFTA_R1_00730576
EFTA02110477
: 323025 (P) Airframe Main Gear Side Brace Fitting Pin (Left) -
Inspection Tolerant
e
+15 DAY
Due: End
Of Month
323026 (1:, AlrfraIlle Geaf Side Brat;"
Lnspect:cn Tolerant
+15 DAY
Due: End
Of Month
362005 Airframe Bleed Air Manifold Pressure Indication - 24 h.
Functional Test Tolerant
e
+15 DAY
Due: End
Of Month
: 510070 Airframe 24 Month Honeycomb (Aluminum Panels Only) - 24
Inspection / Bond Test Tolerant
+15 DAY
Due: End
Of Month
4
521007(P) Airframe Main Entrance Door - Inspection
Tolerant
e
+15 DAY
Due: End
Of Month
521024(P) Airframe Main Entrance Door Hinge Pins - Inspection
Tolerant
+15 DAY
Due: End
Of Month
EFTA_R1_00730577
EFTA02110478
521051 Airframe Door Seal Pressure Regulator - Functional Test 24 h.
H 532017 (P) Airframe Cockpit Compartment Above Floor - Inspection 24 h
Toleranc
2
+15 DAY
Due: End
Of Month
1/1 532019 (P) Airframe Cockpit Compartment Below Floor - Inspection 24
Toleranc
e
+15 DAY
Due: End
Of Month
M 532021 (P) Airframe Cockpit Compartment Below Pedestal - 24 •
Inspection Toleranc
+15 DAY
Due: End
Of Month
H 532027 Airframe Entrance Compartment Behind Panel - Inspection ^4
Toleranc
+15 DAY
Due: End
Of Month
H 532029 Airframe Entrance Compartment Above Floor - Inspection 24 ti
'15 DAY
Due: End
Of Month
EFTA_R1_00730578
EFTA02110479
532031 (P) Airframe Entrance Compartment Below Floor - Inspection 24 fi
El 532033 (P) Airframe Entrance Compartment Shelf - Inspection 24 h
13
itfilll l
00 .
Diii:
tit
VI 532041 (P) Airframe Baggage Compartment Above Floor - Inspection 24 ti
Toleranc
2
+15 DAY
Due: End
Of Month
532045 Airframe Baggage Compartment Behind Panel - 24 I
Inspection Due:
End Of
Month
DI 532050 Airframe Engine / APU Fuel Feed Line - Inspection 24 N
MI 532052 (P) Airframe Torque Box - Inspection 24 N
Toietand
I
+16 DAY
Due: End
Of'Month
EFTA_R1_00730579
EFTA02110480
M 532055 Airframe Fuselage Interior / Wing Attach - Inspection 24 N
E 532070 Airframe Shear Clips Aft Fuselage - Inspection 24 It
3000 Hrs Ir
533005 Airframe Exterior Fuselage - Inspection 24 M
Toleran0
e
+15 DAY
Due: End
Of Month
535008 (P) Airframe Nose Compartment / Radome Interior - 24 N
Inspection Toleranc
+15 DAY
Due: End
Of Month
535012 (P) Airframe Tail Cone Interior - Inspection 24 It
Toleranc
e
+15 DAY
Due: End
Of Month
562005 (P) Airframe Emergency Window Release Mechanism 24 N
(Internal and Extemal) - Functional Test
EFTA_R1_00730580
EFTA02110481
Due: End
Of Month
Cgl 783005 (P) Airframe Engine Thrust Reverser (Left) - Inspection
Toleranc
e
+15 DAY
Due: End
Of Month
N 783006 (P) Airframe Engine Thrust Reverser (Right) - Inspection
Toleranc
e
+15 DAY
Due: End
Of Month
N 236020(P) Airframe Static Discharger Wick (Tail Cone) - Resistance
Check Toleranc
e
+15 DAY
Due. End
Of Month
7. 243030 (P) Airframe Auxiliary TRU - Inspection Cleaning 24 h.
Toleranc
2
+15 DAY
Due: End
Of Month
243189 Airframe Battery Circulating Fan - Operational Test 24 N
Tolerant
e
+15 DAY
Due: End
Of Month
21262621 (P) Airframe Portable Halon Fire Extinguisher (Right Cockpit) - 12 f
Weight Check
EFTA_R1_00730581
EFTA02110482
e
+15 DAY
Due: End
Of Month
: : 320009 (P) Airframe Landing Gear (Left Main) Corrosion Inhibiting
Compound Reapplication Toleranc
ℹ️ Document Details
SHA-256
7816cd5c9caa62582ccc1472ac8de22029c6954aa15c518d6065c76e80217aa9
Bates Number
EFTA02110465
Dataset
DataSet-10
Document Type
document
Pages
32
Comments 0