EFTA00817778.pdf
👁 1
💬 0
📄 Extracted Text (257 words)
From: "Jeffrey E." <[email protected]>
To: Brice
Cc: Richard Kahn >, LSJ GSJ
Subject: Re: LSJ SW RO Refurbishment
Date: Sat, 05 May 2018 13:16:12 +0000
rich negotiate and do all
On Sat, May 5, 2018 at 9:02 AM wrote:
Rich
Attached are proposals from both TSG and GWS (Gemini Water Services) for the refurbishment of the SW RO on LSJ
As shown there are Immediate Repairs required
Replacement of Control Panels, 75 hp Motor, Pump and Media filter service.
This is outside of any work TSG have already been approved for.
At this time the RO is operational, but failure of any of the above items would cause the plant to shutdown and
the Repair Time would be Lengthy and could lead to water restrictions and or the need to purchase water.
The option to Expand the Plant could be done at the same time.
My recommendation is to proceed with Gemini Water Services.
Can we proceed with finalizing contracts with GWS?
regards
The Saint James Group
USVI
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00817778
ℹ️ Document Details
SHA-256
786b34b6194f8bc057ecedaf9bdb567103bed7ac38dfd227a238533ee6381fb0
Bates Number
EFTA00817778
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0