EFTA00817778.pdf

DataSet-9 1 page 257 words document
👁 1 💬 0
📄 Extracted Text (257 words)
From: "Jeffrey E." <[email protected]> To: Brice Cc: Richard Kahn >, LSJ GSJ Subject: Re: LSJ SW RO Refurbishment Date: Sat, 05 May 2018 13:16:12 +0000 rich negotiate and do all On Sat, May 5, 2018 at 9:02 AM wrote: Rich Attached are proposals from both TSG and GWS (Gemini Water Services) for the refurbishment of the SW RO on LSJ As shown there are Immediate Repairs required Replacement of Control Panels, 75 hp Motor, Pump and Media filter service. This is outside of any work TSG have already been approved for. At this time the RO is operational, but failure of any of the above items would cause the plant to shutdown and the Repair Time would be Lengthy and could lead to water restrictions and or the need to purchase water. The option to Expand the Plant could be done at the same time. My recommendation is to proceed with Gemini Water Services. Can we proceed with finalizing contracts with GWS? regards The Saint James Group USVI please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00817778
ℹ️ Document Details
SHA-256
786b34b6194f8bc057ecedaf9bdb567103bed7ac38dfd227a238533ee6381fb0
Bates Number
EFTA00817778
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!