EFTA02343877
EFTA02343881 DataSet-11
EFTA02343884

EFTA02343881.pdf

DataSet-11 3 pages 521 words document
P17 V16 P22 P23 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (521 words)
From: Richard Kahn Sent: Tuesday, August 25, 2015 8:53 PM To: jeffrey E. Cc: Leighton Allenby; Merwin Dela Cruz Subject: Luton Job at 71st Street along with pictures i just spoke with Al from Clarity regarding the Lutron =roject and he told me the following: Monday they opened up the 1st and 2nd =loor panels - They were forced to open both at once since they are both =ed by the same circuit breaker The 4th floor panel =as not yet been touched and is fully operational along with the 3rd =loor There will not be any lighting all week other =han temporary construction lighting (see photos below) which is =flowing them to perform their work Unfortunately =hey cannot stop job as panels are already open and do not anticipate =ny functionality until Friday afternoon At that =oint in time there will be moderate functionality of the 1st and 2nd =loors with 3rd and 4th floors remaining fully operational Richard Kahn HBRK Associates Inc. 575 Lexington =venue 4th Floor New York, NY 10022 On Aug 23, 2015, at 9:53 AM, =effrey E. <[email protected] <mailto:[email protected]> wrote: yes On Sat, Aug 22, 2015 at 4:47 PM, =ichard Kahn wrote: Please advise it is ok for Lutron job to =esume Monday. Thank you. Sent from =y iPhone Begin forwarded =essage: From: Al Buonanno Date: August 21, 2015 at 3:00:11 PM EDT To: Richard Kahn EFTA_R1_01312405 EFTA02343881 Cc: Merwin Dela Cruz Leighton Allenby C. Subject: RE: Luton Job Hello Richard and =erwin, I trust that everything is on schedule for us to begin =ismantling the system this coming Monday morning. Please advise =s if there are any issues with us beginning then. Please note =hat lights will be out in most of the residence. We will have =emporary lighting set up to allow us to work but certainly not enough =o cover the entire home. ON a similar note and am hopeful that Mr. =pstien was okay with our "work in progress" appearance and that our =resence wasn't a great inconvenience. Regards, Al Original =essage From: Richard Kahn Sent: Tuesday, August 18, 2015 11:11 =M To: Al Buonanno Cc: Merwin Dela Cruz 4 ; Leighton Allenby Subject: Luton Job I just spoke with mr =pstein and he said he will be returning wednesday evening or thursday =m he would like the 1st and 2nd floor protection to be removed as of =ow job will resume monday august 24th sorry for any additional work and =roubles this may cause regarding glass mr epstein thinks we may =ave extra in the house - merwin please speak with jojo as he may know =ocation of glass if we do have extra thank you Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New =ork, NY 10022 Begin forwarded message: From: =/b>" Subject: =/b>Construction =ights Date: =/b>August 25, 2015 at 4:47:32 PM =DT 2 EFTA_R1_01312406 EFTA02343882 To: =Th>Richard Kahn These are the lights Al is talking about First floor panel. Wires taken out from the breaker and ready =o be pulled out of the wall Second floor: Here is the new panel Merwin =ela Cruz 3 EFTA_R1_01312407 EFTA02343883
ℹ️ Document Details
SHA-256
7917a0bc200934ee0783e71ad1b0c71332b003c741bd9259a16ab9ee5a84b525
Bates Number
EFTA02343881
Dataset
DataSet-11
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!