EFTA01744068.pdf

DataSet-10 4 pages 664 words document
P17
👁 1 💬 0
📄 Extracted Text (664 words)
From: Richard Kahn ‹ > Subject: Re: Work update Non Priority Items Sent Tuesday, December 15, 2015 1:36:42 PM To: "Jeffrey E." [email protected]> yes either merwin or i will go to store today what seems strange is that they only need one I meter cable.. i would like to speak with hector early this am rather than relying on cecile email below Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York NY 10022 tel fax cell Begin forwarded message: From: Cecile de Jongh < Subject: Re: fiber project Date: December 15 2015 at 3:13:43 AM EST To: Richard Kahn < Hector told me today that buying at least one back up is best. Perhaps with this we should buy three; one to install and two back ups. I am going to have him give us a list of these types of things that will need to be replaced from time to time so that we can have backups at the ready. With warm regards, Cecile Sent from my iPhone and misspellings courtesy of iPhone. On Dec 14, 2015, at 10:14 PM, Richard Kahn sc > wrote: I see cable is 1 meter. Is that the size you need. If do what quantity shall we buy. Please advise. Thank you. Sent from my iPhone On Dec 14, 2015, at 8:38 PM, Hector Cintron ‹ > wrote: EFTA_R1_00035948 EFTA01744068 You're better off if someone can buy it locally in NY, there should be a few stores there you can walk in and buy them. On Dec 15, 2015, at 8:33 AM, jeffirey E. leevacation®gmail.com> wrote: lets make sure i have that cable when i fly tomorw Forwarded messy e From: Cecile de Jongh Date: Tue, Dec 15, 2015 at 3:06 AM Subject: Fwd: Work update Non Priority Items To: J E <[email protected]> With warm regards, Cecile Sent from my iPhonc and misspellings courtesy of iPhone. Begin forwarded message: From: Hector Cintron ‹ > Date: December 15.2015 at 12:15:45 AM GMT-4 To: Richard Kahn Cc: Jermaine Ruan <farewelltomone mil. m>, Cecile de Jongh , Ann Rodriquez cannrodriquezayahoo.com>, Omar Welch <OW lic% Choice.vi> Subject: Work update Non Priority Items Hi Everyone: here is a brief description of the non priority items done today. • Installed 2 PoE injectors to the Rockus bridge and AP at the shelter site • Move Ruckus bridge and AP from the netgear router to the 3560 at the shelter • Turn off Netgear switch. EFTA_R1_00035949 EFTA01744069 • Unplugged old power brick from ups that was not in used at the shelter. • Reconfigure cisco ports (Gym/Shelter) where Rockus bridge are connected (from Access port to Trunk Port) • Interconnected Choice switch with LSJ switch at the Gym • Accessed cabinet at Vessum Beach to verify fiber connector (around 5PM) With today changes I'm now able to monitor the switch at the gym and I was able to route LSJ data vlan to the Rockus AP that points to 5 Palms. Jermaine was able to test the WiFi connection and was able to access the intemet via that AP. Also I verified what cable is needed at Vessum. It's a I meter, single mode simplex fiber cable ST to ST. Attached is the changes to the preliminary report. Changes/additions are coded in red. let me know if you get the cable on Wednesday so I can schedule the installation of the cable at Vessum. please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by EFTA_R1_00035950 EFTA01744070 return e-mail or by e-mail to jeevacationagmail.com and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved <LSJ Preliminary Report - 151214.pdf, EFTA_R1_00035951 EFTA01744071
ℹ️ Document Details
SHA-256
793cad87bfb08ed12fbabb573c5c4f109760b79d38102bdf92d615e87365c992
Bates Number
EFTA01744068
Dataset
DataSet-10
Type
document
Pages
4

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!