To: lesley gro
Jeffrey Epsteinfieevacationegmall.comj
From: Richard Bamett
Sent Mon 8/19/2013 8:35:36 PM
Subject: RE: JE coming back this Thurs. Aug. 22nd
Hi Lesley the Chiller & Cooling Tower installation is almost complete but we have one issue that
may impact the system from operating at 100% cooling capacity by Thursday Aug.22nd . We
found both Cooling Tower motors from the manufacturer defective during the commissioning
test phase today . Both motors are two speed ,the fan motors both run in low speed but not in
high speed . The high speed cycle is needed when the outside temperature rises, and due to the
expected hot weather the high speed is needed . I will find out by tomorrow when the new
replacement motors will be installed. I am currently running 80% of the house ac fan
unit equipment with both cooling towers in low speed and maintaining proper set points. I want
Mr. Epstein to know if the new motors are not installed by Wednesday, I would have to load
shed to keep his master bedroom cool at night. I will have a better idea of the motor
replacement status by tomorrow. Richard
> From:
> Subject: JE coining back this Thurs. Aug. 22nd
> Date: Mon 19 Au 2013 15:28:12 -0400
> To:
> Hi Rich..hope all is well! Jeffrey requested I check in with you and make sure the house will be
ready for his arrival this Thursday Aug. 22nd...He is due to land around 6-6:30pm...please let me
know! thanks, Les
EFTA_R1_00431991
EFTA01959183
ℹ️ Document Details
SHA-256
7991d24ffa2a2082e7c20c79bf5aa3a48f91e7ec94eb4548f25d650584a6b056
Bates Number
EFTA01959183
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0