EFTA01959183.pdf

DataSet-10 1 page 256 words document
P23
👁 1 💬 0
📄 Extracted Text (256 words)
To: lesley gro Jeffrey Epsteinfieevacationegmall.comj From: Richard Bamett Sent Mon 8/19/2013 8:35:36 PM Subject: RE: JE coming back this Thurs. Aug. 22nd Hi Lesley the Chiller & Cooling Tower installation is almost complete but we have one issue that may impact the system from operating at 100% cooling capacity by Thursday Aug.22nd . We found both Cooling Tower motors from the manufacturer defective during the commissioning test phase today . Both motors are two speed ,the fan motors both run in low speed but not in high speed . The high speed cycle is needed when the outside temperature rises, and due to the expected hot weather the high speed is needed . I will find out by tomorrow when the new replacement motors will be installed. I am currently running 80% of the house ac fan unit equipment with both cooling towers in low speed and maintaining proper set points. I want Mr. Epstein to know if the new motors are not installed by Wednesday, I would have to load shed to keep his master bedroom cool at night. I will have a better idea of the motor replacement status by tomorrow. Richard > From: > Subject: JE coining back this Thurs. Aug. 22nd > Date: Mon 19 Au 2013 15:28:12 -0400 > To: > Hi Rich..hope all is well! Jeffrey requested I check in with you and make sure the house will be ready for his arrival this Thursday Aug. 22nd...He is due to land around 6-6:30pm...please let me know! thanks, Les EFTA_R1_00431991 EFTA01959183
ℹ️ Document Details
SHA-256
7991d24ffa2a2082e7c20c79bf5aa3a48f91e7ec94eb4548f25d650584a6b056
Bates Number
EFTA01959183
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!