EFTA02369618.pdf

DataSet-11 2 pages 453 words document
👁 1 💬 0
📄 Extracted Text (453 words)
From: Richard Kahn Sent: Thursday, June 30, 2016 5:57 PM To: jeffrey E. Subject: Fwd: Florida Windows Attachments: Screenshot 2016-06-29 15.09.20.png; Untitled attachment 00436.htm; Screenshot 2016-06-29 15.30.04.png; Untitled attachment 00439.htm; Screenshot 2016-06-29 15.09.10.png; Untitled attachment 00442.htm; Screenshot 2016-06-29 15.09.00.png; Untitled attachment 00445.htm; image003.jpg; Untitled attachment 00448.htm; SAF- Q16-040 -B Richard Kahn Proposal .pdf; Untitled attachment 00451.htm; SAF- Q16-040 -B Richard Kahn TakeOff .pdf, Untitled attachment 00454.htm i know you approved =lready however i wanted to send you all facts that i am aware of so =here are no surprises 1) =indow Functionality currently you have horizontal rollers =see picture 1 below) unfortunately =orizontal rollers are no longer made in wood mahogany Hartman (original bid =rom dan labonte and vendor that supplied LSJ) proposed a wood mahogany =utswing casement window (see picture 2 below) bid =as 224,250 before other work, permit fees and gc fees -> projected =ost 298,000 Coastal proposed a wood mahogany tilt and turn window (see =ictures 3 & 4 below) Proposal was for windows =o tilt and turn in (picture 3) however if you do not like they can tilt =nd turn out (picture 4) Scott from Coastal =elieves the tilt and turn in is a better design negotiated bid is 90,000 before other work and permit fees => projected cost 125,000 2) Next =teps a) wire requested is 50% of materials and =ermit fees or 32,727.83 along with signed contract b) shop drawings will be ready in 2 weeks for your =eview c) file for permit d) order windows (12-14 weeks) e) =nstall windows (2-3 weeks) Projected completion date November 1- 15 3) Other contractor work =equired Drywall / Stucco repairs Repaint trim =nd walls around windows EFTA_R1_01369945 EFTA02369618 Protection Remove any window treatments and put back when =ompleted Remove any art and furniture Alarming of new windows Removal =nd reinstall of storm shutters 4) Work to be provided by Coastal =indows Removal of old and installation of new =indows Bucking / Waterproofing Rain simulation testing Scaffolding Portajon 5) Other Notes a) Windows will be staged in garage bay =t 358 el brillo b) Windows (interior and exterior) =ill receive 2 coats of primer and 2 coats of topcoat c) Hardware for Multipoint lock system (medco or tricoat) =nbsp;- you will choose at time of shop drawings (satin nickel, oil =ubbed finish) d) Framing currently is 2.5 inches =hick and new window frames will be 3 inches thick e)=Currently we do not have screens and they are not proposed in =id f) Warranty - 1 year on installation and 10 =ears from manufacturer for failure in workmanship g)=House to be painted after windows are installed (3.4 weeks) Please advise if ok to proceed Thank=you PICTURE = 2 EFTA_R1_01369946 EFTA02369619
ℹ️ Document Details
SHA-256
799feb7e167d304b88abfa0243f7e86a668896e18e48200b495b5d37fd4c2a8a
Bates Number
EFTA02369618
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!