EFTA01126545.pdf

DataSet-9 2 pages 127 words document
P23
👁 1 💬 0
📄 Extracted Text (127 words)
Presented By: Created: 5/7/2012 Modified: 5/24/2012 CUTTINIGEDGE S T E PI wELL DONE Cutting-Edge Systems, Inc swap projector and re-program Crestron 85-41. 91st Street, Epstein Woodhaven, NY 11421. 9 east 71st street 718-850.7752 New York New York 10021-4102 Oty Description Price Media Room 1 Digital Projection M•Vision Cine 400 (111.148) 12,995.00 M-Vision Cine Native 1080P. 500 lumens: 2000:1 contrast ratio; 1.56 - 1.86 lens 1 Chief Manufacturing RPMUBK 229.00 Universal ceiling mount for projector 1 CES 1"-2" Flange 30.00 Flange for projector mount installation Project Subtotal: $13,254.00 Cutting-Edge Systems, Inc Page: 1 of 2 EFTA01126545 Project Summary Equipment: $13,254.00 Install Labor: $1,560.00 Sales Tax: $1,176.29 Labor Sales Tax: $138.45 Grand Total: $16,128.74 DATE: Owner: DATE: Contractor: Cutting•Edge Systems, Inc Cutting•Edge Systems, Inc Page: 2 of 2 EFTA01126546
ℹ️ Document Details
SHA-256
79c7b6386bdc3169fd09e10b22aad2aab9ba420f251f1d453ada9bd019d98eb9
Bates Number
EFTA01126545
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!