EFTA01754878.pdf
👁 1
💬 0
📄 Extracted Text (133 words)
Sent Wednesday, September 18, 2013 2:31:13 PM
Subject: LV Landscapin
From: Brice Gordon
To: Jeffrey Epstein cjeevacation©gmail.com>
Cc: Rich Kahn Zorro Ranch
Jeffrey
below is the breakdown for laying sod at Larry's House
this will match existing fescue sod layed originally.
we will need a helper to assist with the laying of the large rolls of sod
4 days work, two days soil prep, two days for laying sod
the cost for Sod $3370.50
topsoil 58yds 1250.00
transportation 2 loads 700.00
helper 16hrs @ $12.00 hr 192.00
total cost $5512.50
do we your approval to proceed.
-- <1 10A- - 0 Dii,12/ 2blehEliy2o11,1/2- ii,WWARy11,12/ $11,1/241/2ii,12/ 1 11,12/ -
+ ~ 0 DTe/a2bli,1
4
/ EILISTLV2- IVAILIARyle/2$141
2
/ 1e,12
/ 71,1/2-11,1/2k14
/ 1‘;12/ 11,1/211„Y2TVATOSIVAIVA
ii,V2IL'Aleir -I -I — • cf* I-
EFTA_R1_00055417
EFTA01754878
ℹ️ Document Details
SHA-256
7a3d7c3c9fa92cf7c30fbde32d9db516d778cae8b877e3128ca250535ac32ef0
Bates Number
EFTA01754878
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0