EFTA02315458.pdf

DataSet-11 2 pages 479 words document
D6
👁 1 💬 0
📄 Extracted Text (479 words)
From: Daphne Wallace Sent: Monday, May 20, 2019 3:53 PM To: michael glidden Cc: Stephanie Remington; Patrick Cena; Rich Kahn; ann rodriquez; Karyna Shuliak Subject: Re: Shipping Updates - May 20, 2019 Greetings Mike, One load. On Mon, =ay 20, 2019 at 10:49 AM michael glidden < wrote: Thank you Daphne. I have sche=uled with the temp. barge for Wednesday to pick up the plants at ABC. Coul= you please confirm with ABC as to how many loads it would be with our 450= Thank you again. Sent from my iPhone On May 20, 2019, at 11=19 AM, Daphne Wallace wrote: Greetings Mi=e, STT Items for transport to LSJ via Little C =C24> ABC Nurs=ry Plants - (25) Sea grapes, (20) tree braces for LSJ - purcha=ed 5/13 - ready for pickup Arrived/Sailed/Booked to Sail BOL 13713967=C24 Fletcher Larkin Buildi=g Supplies - (12) cement bags for construction stock - on STT 5/11 - clear=d, off-loaded, awaiting pickup =OL 13720832 - on STT 5/11 - cleared, off-loaded, awaiting pick=p = - GEI Works - Type 2 HD Permeable Silt Barrier =or GSJ 40=A0 -=C24,American Export - LSJ GYM Doors & Windows replacement40=A0 BOL 13723585 - Lewis Marine - dock lines - on STT 5/14 - cleare=, off-loaded, awaiting pickup BOL 13640387 - 2019 Freightliner 122SD dump truck - on STT - registered, parked, aw=iting transport over to LSJ BOL 137344=5 - sailed 5/19 - EDA on STT 5/22 =C24, - Tiki Shack Importers - (70) rolls of Thatch EFTA_R1_01210291 EFTA02315458 =C24> - Wayfai= - (100) Pure Garden Solar Path Bollard LED Pathway Lights, pe= JE BO= 13665718 - Warren CAT - (1) Caterpillar CS54B Roller with Shell Kit - sai=ed 5/19 - EDA on STT 5/22 BOL 13677820 - EBL Watercraft - GIBBS Qu=dski returned to dealer for repairs per JE - at EBL Watercraft=in FL BOL 13623863 - 2015 GMC Yukon Denali (JE) - sailed 5/6 - EDA in Le Havre France 5/2640=A0 Awai=ing Delivery to Tropical - Or to LSJ via FEDEX, ETC. Hangar Door Specialists - =WA hangar door repairs - materials delivered to STT CARGO 5/9 - sail sched=le pending BeverageFactory.com <http://BeverageFactory.com> - Summit Appliance Commercial Ou=door Freezer for Tiki House - shipped 5/15 - EDA to Tropical FL 5/22 =div> Home Depot - H0220-160458 - (2) Samsung washers and (2)=Samsung dryers for LSJ - purchased 5/17 - EDA to Tropical FL 5/22 Innovation Solar Garden P=oducts - (2000) Garden lights - production completed - NOW ETD China 5/21 = EDA to MIA 45 days - NOW EDA=to STT 7/27 Tropicars - (3) 2019 Polaris R=nger EV, rust proofing kit included - purchased 5/10 - Lead Time 12 weeks = EDA ready to ship 8/2 Buck Steel - Project B536653 Order - 40 x 60 St=el building replacement for Heavy machinery storage - Engineering Deposit =aid 4/18 - EDA to Tropical FL pending 2 EFTA_R1_01210292 EFTA02315459
ℹ️ Document Details
SHA-256
7a68b90c96089e05a5ad86d8fdd1808af33ee42dc464822f6a2331b6f4247ea9
Bates Number
EFTA02315458
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!