From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Subject: Re:
Date: Mon, 05 Aug 2013 22:25:44 +0000
Greetings Sir,
I will pursue Florida. Jimmy is already doing so, he has called two of his contacts in the Miami area for
recommendations.
Jimmy says once the permit is obtained, 4 days to form the road, 2-3 days to pour - a total of 6-7 days. If he has
to get the concrete trucks one at a time, it may take a little longer, but 10 days is the extreme worst case scenerio.
Respectfully,
Daphne
On Mon, Aug 5, 2013 at 5:15 PM, Jeffrey Epstein <[email protected]> wrote:
there are many steel co fro hangarss, check,florida... how long will road take after reciving approval?
On Mon, Aug 5, 2013 at 11:27 AM, Daphne Wallace < > wrote:
Greetings Mr. Epstein,
Jimmy is still planning to begin working on LSJ week of 8/19. He is so far on schedule to conclude his
other projects on St. Thomas, so barring weather, he will be starting with the tile work week of 8/19.
1. Tile work - the tiles are scheduled to arrive at the port in DR on 8/15. EDA to sail from Santo Domingo is
8/22, EDA on STT 8/24, will can clear and pick up on 8/26. This schedule is perfect for Jimmy, who
anticipates that the slab pour for the tile will take 6-7 days, and after that the tiler comes in and he will take
approximately 2 weeks. The thinset will be on STT on 8/10, Jimmy gave me the parts order for the pool
drain this morning, I sent the quote to Jimmy to confirm it has everything, and will order once he confirms
today. The grout will be purchased locally, I will call Floor Factory to reserve the quantity once Jimmy
gives it to me this week. Jimmy says this project, barring weather, is still estimated at 3 weeks.
2. Gym road - spoke with the surveyor this morning. They should have the drawings this week. Jimmy has
offered to push through the application with his contacts at DPNR, we just have to get the application in
order. I am reaching out to John at Jaredian Design for guidance. Jimmy says he can still begin the prep
work for the road pour once he is on site, in anticipation of the permit coming through. Still scheduled to do
the road work along with the tile work, barring weather, and any permitting delays.
3. Five Palms Dome - Samson broke the quote out - Materials $7,845 (nuts, bolts, framing aluminum, plate
and shipping costs associated with constructing and installing the dome) and Labor $8,640 (3 men ®
$90/per hr @ 8 hrs/day @ 4 days). Jimmy will call Samson to discuss. There is no start date for this project.
4. Main Entrance - Jimmy and the masons plan to come to LSJ on Wednesday morning for a site visit so
they can discuss options of stone for your review. There is no start date for this project.
5. Waterfall - Jimmy needs advisement on what you would like for the waterfall. There is no start date for
this project.
EFTA00966470
6. Tennis court - There is no start date for this project.
7. New garage for Mechanical area - Jimmy needs advisement on location and dimensions so we can seek a
quote. There is no start date for this project.
8. New hangar - Jimmy and I have had no success with Capitol Steel Structures, so Jimmy is calling his
contact in Texas, and I will follow up to get them the specs for the building. There is no start date for this
project.
Respectfully,
Daphne
On Sun, Aug 4, 2013 at 8:27 AM, Jeffrey Epstein <jeevacation®gmail.com> wrote:
equipment ? real schedule for jimmys work, start date finish.etc
***********************************************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected] and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
***********************************************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
EFTA00966471
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00966472
ℹ️ Document Details
SHA-256
7aaaa129c35ea9b1755db1602699bd3b1fcada9fd8734d8a0bd8d6a732e26092
Bates Number
EFTA00966470
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0