📄 Extracted Text (587 words)
To: Brice Gordon[[email protected]]
From: Jeffrey Epstein
Sent Fri 3/18/2011 3:49:06 PM
Subject Fwd:
Forwarded messa e
From: ion nicola
Date: Fri, Mar 18, 2011 at 8:46 AM
Subject: RE:
To: Jeffrey Epstein [email protected]>
hi jeffrey,
..i've just remembered about the lighting in the library..on the island. probably you saw many
pictures of the ceiling(sky with clouds) but its hard to notice the differences of the light on
different sides of the ceiling. in fact when you get inside thru the door, the front side has very
strong and cold light and the left side too. the right side and the the side with the doors are
darker. probably they put different bulbs(tubes) and some are not working too.
so if the sky looks too light in some parts is because the lightning. you can turn off the light see
the real color which is kind if dark..but i did it that way because i of the lightning.
anyway, i think the ceiling looks nice.
then in the other rooms were more things i couldnt finish because they told me in the last day.
with a kw days before i left, bricc came to me and asked me how many more days i need to
finish everything because he wanted to buy my airplane he said i have to finish
office(the doors and window) and the vestibule doors and thats it. so i told him i need like two
three days for that. but then in the last day came and she told me i have to fix the wall in
the bathroom in cabana no2 because they moved the rack is on top of the toillete. then another
guy came in the morning telling me that i have to mach the frame of two mirrors he built for the
master bathroom. then the electrician came with more switcher plates for office and he
told me that i have to match those like the wall.., besides that i scheduled to do those two doors
in the vestibule in last day, but then when i got there in the morning one door was not
finished..then someone came and started patching and sanding the door, and then primering..and
then painting... so thats why i couldnt finish both doors.
anyway, i told when she told me about £icing the bathroom wall in cabana no 2, that i
need mile one or two days to finish everything, so i told her to cancel my ffight..but then she
called and they decided that i probably have to come back for more touch ups..because
now all the cabanas,I,2,3 are full with a lot of furniture.. so probably when they are going to
move the furniture again..will going to damage the walls.
but untill they are going to move the fumiture..and while i am in new york, do you want me to
start something at the house on 71st st or take a brake for a while?
what do you think?
thank you.
ion
EFTA_R1_00220058
EFTA01838156
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00220059
EFTA01838157
ℹ️ Document Details
SHA-256
7b40923ae76925dc5635386e8a1bb1a28c3c4731ac8249958aaf91fd499fd441
Bates Number
EFTA01838156
Dataset
DataSet-10
Document Type
document
Pages
2
Comments 0