📄 Extracted Text (240 words)
From:
Sent: Monday, May 21, 2012 11:38 PM
To: Richard Kahn
Cc:
Subject: Scope of work for Ion and Michael
We have 6 apartments that need to be painted. 4 one bedroom apartments and 2 studios.
The flooring people are going to do their work first so that the floors and baseboards are done by the time Ion and
Michael begin.
They are just going to do a basic painting job in each apartment, no special effects or details. All walls and the ceiling in
each apartment will need to be painted.
The work will include the following:
Compounding the walls where there are cracks/uneven surfaces. (The walls are in relatively good condition) Applying a
primer Applying 2 coats of paint Michael is also going to replace the crown molding in one of the apartments (8H).
Ion has estimated that it will take them 2-3 days for the studio apartments and approximately 4 days for the 1bedroom
apartments. He says this is an estimate and he will have a better idea after doing the first apartment (He will start in 8H
which is a 1 bedroom). I know the fact that it is an estimate unfortunately doesn't make calculating the cost easier.
<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.O.dtd">
<plist version="1.0">
<dict>
<key>date-sent</key>
creal>1337643465</real>
<key>flags</key>
<integer>8590195713</integer>
<key>original-mailbox< ke >
<string>imap INBOX</string>
<key>remote- < ey>
<string>28821</string>
<key>subject</key>
<string>Scope of work for Ion and Michael</string> </dict> </plist>
EFTA_R1_01187943
EFTA02308447
ℹ️ Document Details
SHA-256
7b827fd1fae7d308381af9605631f9e9f5d1a63dd84921076224fed2c0b3184f
Bates Number
EFTA02308447
Dataset
DataSet-11
Document Type
document
Pages
1