From: Jeffrey Epstein <[email protected]>
To: Warwick Wicksman
Subject: Re: Latest Plan Study
Date: Fri, 18 Mar 2011 15:13:49 +0000
thanks„ lets have a call. you gary and I „ the images are a great help, the living room needs a view from the
screening room terrace. the roadway have to be complete„ the dirt against the wall without the road entire
circulation is very misleading. i am available all day
On Fri, Mar 18, 2011 at 7:32 AM, Warwick Wicksman < > wrote:
I agree we are not where I had hoped to be, but we have provided more design information, and made some good
progress on several items. Because we are still discussing some base conceptual issues, I can't release a team to move
full-steam ahead. Here's where I think we stand on each area, and what we need to do to get to the next level.
For the main residence areas, we really need some direction as to which of the two latest schemes to move forward
with.
• I thought we had a good basic direction after your visit, including the layout of the stairs, basic terrace layout and
general living room location. We re-did the entire model of this area to reflect this. We are still refining some views and
final elevations. (See image] .pdf, attached.)
• Later we were asked to study the new terrace layout, with the big terrace area at road level. We are concerned that
there just isn't enough room to fit everything in, and Gary has told us moving the service road north is not feasible. (See
image2.pdf, attached.)
• Do you have a preferred version we can really start to get into and develop?
For the pool area, we are splitting our time between trying to give Gary what he needs for the main building (despite the
fact that it is not "designed" yet), and modeling the pool-side cabanas. Again, I am concerned that this will be built
before it is designed, but we are running with the direction given to us.
• We sent Gary a few revised versions of the floor and roof plans, and a basic section. I think that is set.
• Gary has asked us to block out the interior elevations and electrical, so he can review it with you. We are working
on that.
• We are revising the pool-side cabanas per your comments — but all we have been told is "too massive, try more
open".
I will send you the views of the living room from the screening room terrace today, and the door comparisons for the
pool building. If we can determine a primary direction for each of these areas, we can really move forward with the
detail.
Thanks,
EFTA00906743
Warwick
NNarnick Micksman. .\1.\
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
mI 3://www.Gensler.com
Click here to view Gensler's 2010 Annual Report.
From: Jeffrey Epstein [mailto:jeevacation@gmail com
Sent: Friday, March 18, 2011 6:58 AM
lb: Warwick Wicksman
Cc: Gary Kerney
Subject: Re: Latest Plan Study
it has been two weeks since i was at your office.. we are not much further ahead, with either the flagpole pool
or terrace.s IS there somthing i can do to move this along,
On Thu, Mar 17, 2011 at 6:20 PM, Warwick Wicksman < > wrote:
Ok — I was confused why you write that the scheme does not work. Tom's focus for that quick sketch was the terrace
area, and eliminating the upper steps. The road to the library, and the connection on the east, can be worked out. But I
need to know if this new area is worth considering. See attached.
Warwick
Vai w ick Vic ksm a n. Al A
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
mI 311www.Gensler.com
Click here to view Gensler's 2010 Annual Report.
EFTA00906744
From: Jeffrey Epstein [mailto:jeevacation@gmail com
Sent: Thursday, March 17, 2011 5:46 PM
To: Warwick Wicksman
Subject: Re: Latest Plan Study
it is not the scheme, but the roadway form the library that is drawn, without attention to the many photos..I
recognize that you are spending time trying to find a solution, i am confused how one is proposed that hangs
off the cliff. it is the road from the library to the service road , opposite the kichen that is once again a fiction,
the east side ,may allow us to cheat. 505 938 2929 „ thanks.
On Thu, Mar 17, 2011 at 5:37 PM, Warwick Wicksman < > wrote:
Jeffrey, we agreed that this scheme doesn't work. We conveyed our concerns when we spoke on the phone earlier this
week, but you asked us to study it. We are using the topo we got from Gaty/Moseby. It does not reflect any changes
made recently, but it still shows that there just isn't enough room to fit all of this in, and maintain the service road.
Gary, you had some more specific reservations about this layout when spoke earlier. Can you convey them to Jeffrey?
If there is a way to move the road, we need to know where accurately from the surveyor.
We never modeled the new library, as it was away from the area we are focusing on, but we have it now (as best we can
from the photos and limited drawings). I will send you some new images tomorrow.
Thanks,
Warwick
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
http://www.Gensler.cont
Click here to view Gensler's 2010 Annual Report.
From: Jeffrey Epstein [mailto:[email protected]
Sent: Thursday, March 17, 2011 5:04 PM
To: Warwick Wicksman
EFTA00906745
Cc: Gary Kerney
Subject: Re: Latest Plan Study
warwick.. I immediately sent to torn„ his plans are not doable for many reasons„ the road to the library hangs
off the cliff.. I asked that he use the topo.. I am not the profesional. But immediately see it doenst work„ you
have gotten photos and topos, and tom was there .. How can i help. this is silly„ your sketch up guy needs to
put some of this on his plan„ i still have yet to see the living r000m from the screening room terrace.. I am
availble all day today or tomorrow.
On Thu, Mar 17, 2011 at 4:44 PM, Warwick Wicksman < > wrote:
Jeffrey,
Any comments on the plan Tom S sent out? He is out of town until next week. I reviewed it briefly with Gary,
and he did not think we had room to move the road on the east.
Warwick
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
MI /Iwunv.Gensler.com
Click here to view Genslees 2010 Annual Report.
From: Tom Sze
Sent: Tuesday, March 15, 2011 7:03 PM
To: Jeffrey Epstein (jeevacation@gmtn); Gary Kerney
Cc: Warwick Wicksman
Subject: Latest Plan Study
Jeffrey,
Here is the latest plan study G-9 based on the enclosed sketch you sent us last week.
The cascading stairs are gone and it opens up the whole center area. In order to keep the
symmetry of the plan, the newly proposed stairs to the east are encroaching onto the road.
I think you anticipated that as well based on your sketch. We will have to verify if this
Is doable. The plaza at level +37 is a bit too large but it may work incorporating it to the road.
EFTA00906746
We have also moved the Living Room as you had suggested slightly to the northeast.
The spacing between the office and the Living Room is now 25', exactly the same distance
between the bedroom and kitchen.
I am on a business trip the rest of the week and returning Monday.
Warwick will be back Thursday for any comments and/or revisions.
Hope you are well and talk to you next week.
Tom
Tom Sze, AIA
Senior Associate
Gensler
2500 Broadway
Suite 300
Santa Monica California 90404
USA
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00906747
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00906748
ℹ️ Document Details
SHA-256
7bd8f899dcb110d8a349f6a34086262d330348e0797dad6fd4a4c629c2ef272f
Bates Number
EFTA00906743
Dataset
DataSet-9
Type
document
Pages
6
💬 Comments 0