📄 Extracted Text (2,905 words)
Edwards Rotorcraft Solutions Inc. CUSTOMER ORDER
2011 S. Perimeter Road, Suite L
Fort Lauderdale Fl. 33309 Order Number: C03486FL
Phone Or Date: 4/9/2012
Fax Page: 1
Sold To Sh To
FREEDOM AIR INTERNATIONAL, INC FREEDOM AIR INTERNATIONAL, INC
1131 PINE POINT ROAD 1131 PINE POINT ROAD
SINGER ISLAND, FL 33404 SINGER ISLAND, FL 33404
UNITED STATES UNITED STATES
CUSTOMER ID CUSTOMER P.O. PAYMENT TERMS FREIGHT TERMS
04911 PREPAID/CREDIT CARD Freight billed
SALES REP ID SHPPING METHOD F.O.B. SHIP DATE
SHARIEFA AU 2/15/2012
QUANTITY IT UNIT EXTENDED
Otto PART ID I DESCRIPTION X PRICE PRICE
1.00 FLA-MAINTENANCE 300 HOUR / 12 MTH INSPECTION 77,406.10 $77,406.10
Work Order ID: C03486FL 1
SEE DETAIL REPORT
SUB TOTAL $77,406.10
SALES TAX $4,644.37
FREIGHT CHARGES $905.00
TOTAL ORDER AMOUNT $82,955.47
EFTA01120072
EFTA01120073
Date Printed : April 05, 2012
Edwards Rotorcraft Solutions Inc.
Order Charge Detail Report
C03486FL
Customer ID 04911 Aircraft I Item Aircraft Time 823.2
FREEDOM AIR INTERNATIONAL. INC Type iQZ Enloe Time 823.4
1131 PINE POINT ROAD a 53375 823.2
SINGER ISLAND. FL 33404 Reldstration No. tgLuga
Part No Deactl on Isa.ue City MM Unit Price Ext. Price
1743645-03 FUEL FILTER KR 1.00 EA $99.00 $99.00
2-009 PACKING 1.00 EA $10.67 $10.67
206-040-279-101 PACKING 1.00 EA $34.95 $34.95
206-050-247-131 COVER ASSEMBLY RH 1.00 EA $516.00 $516.00
23066697 ELEMENT - LUBE,FILTER 5/0 1.00 EA $692.25 $692.25
555-1OT ROYCO 555 OT 10.00 EA $19.86 $198.60
67588 SPRING 1.00 EA $15.95 $15.95
756-10T ROYCO 756 MILPRF5606H 1.00 EA $9.62 $9.62
AS3208-03 PACKING 2.00 EA $1.00 $2.00
AS3209-014 PACKING 1.00 EA $1.90 $1.90
AS3209-016 PACKING 1.00 EA $14.20 $14.20
AS3209-024 PACKING 2.00 EA $3.30 $6.60
AS3209-113 PACKING 1.00 EA $15.30 $15.30
AS3209-126 PACKING 1.00 EA $3.70 $3.70
M25988/1-138 PACKING 1.00 EA $12.75 $12.75
M83248/1-021 PACKING -PREFORMED 1.00 EA $1.30 $1.30
M83248/1-029 PACKING 1.00 EA $1.13 $1.13
MOBIL254OT MOBIL JET OIL 254 5.00 EA $24.78 $123.90
MS21042L4 NUT 7.00 EA $1.30 $9.10
MS21042L5 NUT 12.00 EA $1.50 $18.00
MS28773-12 RETAINER TEFLON 2.00 EA $2.47 $4.94
MS28774-211 RETAINER TEFLON 2.00 EA $1.45 $2.90
MS28775.211 ORING: NITRILE, 70. HYDRAULIC 2.00 EA $0.67 $1.34
MS28778-16 PACKING 2.00 EA $1.00 $2.00
MS28778-4 PACKING 5.00 EA $0.70 $a 50
MS29513-270 PACKING 1.00 EA $11.40 $11.40
MS9372-029 GASKET. METAL 0 -RING 3.00 EA $18.20 $54.60
$1,867.60
Part No Ihttalise ?zap_ Sellinu PrIce SrL
Se
1271762 PRESSURE VESSEL 2.00 EA P005071FU1 $6,110.00 $12,220.00
204040.760.109 FILTER ELEMENT 3U 1.00 EA P005081FL11 $452.00 $452.00
206-073-761.101 DECAL 2.00 EA P005320FU2 $27.30 $54.60
206-076-034-003 HYDRAULIC FILTER ELEMENT 2.00 EA P005082FU1 $287.00 $574.00
209-340-265-103 SEAL 1.00 EA P005320FU6 $413.00 $413.00
31-023-8B DECAL 2.00 EA P005320FU3 $2.50 $5.00
31-023-9B DECAL 2.00 EA P005320FU4 $3.80 $7.60
406-012-108-107 PITCH HORN ASSEMBLY 2.00 EA PO05232FU3 54,175.00 $8.350.00
406-376-001-101 GASKET 1.00 EA P005081F1J5 $23.05 $23.05
407-001-116-101 SHOCK CORD ASSEMBLY 2.00 EA PO05232FL/2 $113.00 $226.00
EFTA01120074
407-023-003-105 AUX FIN ASSEMBLY 1.00 EA PO05313FU2 $alsoao $8,150.00
407-073-762-101 DECAL 2.00 EA PO05313FU1 $128.00 $256.00
407-362-013-103 FUEL PRESSURE SWITCH 1.00 EA PO05313FU3 51.384.00 $1,364.00
7270 BELT 1.00 EA PO05233FU1 $89.34 $89.34
AS3208-03 PACKING 1.00 EA PO05320FU1 $1.00 $1.00
AS3209-140 PACKING 1.00 EA PO05320FU5 $6.60 $6.60
AS3209-162 ORING: FLUOROCARBON,75 1.00 EA P005231FL/3 $6.15 $6.15
AS3209-236 PACKING 1.00 EA PO05081FU2 $4.60 $4.60
AS3209-240 PACKING 1.00 EA PO05320FL/7 $5.75 $5.75
AS3209-258 PACKING 1.00 EA P005231FIJ4 $8.80 $8.80
D0164-1 BOLT (LONG) 4.00 EA PO05308FU1 $96.00 $384.00
D0314-1 FRICTION PAD ASSEMBLY 4.00 EA PO05292FU1 $973.00 $3,892.00
M2002-1 STARTER BRUSH 4.00 EA PO05231FU2 $96.77 $387.08
MS21920-66 CLAMP 1.00 EA PO05232FU5 $82.00 $82.00
MS28775-015 PACKING 2.00 EA PO05093FU1 $0.53 $1.07
MS28778-12 ORING 3.00 EA PO05328FU1 $3.20 $9.60
MS28778-6 PACKING 2.00 EA PO0S177FU2 $0.85 $1.70
RG407 BATTERY:SEALED LEAD ACID 1.00 EA PO05231FU1 $4,165.00 $4,165.00
SL211-3-1 CLIP NUT 2.00 EA PO05320FU8 $3.15 $6.30
$41,146.24
MISC 40 PERFORM AIR SPEED PEDAL STOP FUNCTIONAL TEST IN $142.50
ACCORDANCE WITH BHT-407-MM CHAPTER 96 PARAGRAPH 96-
358 PG. # 493. PRESSURIZED PITOT TUBE AIRSPEED READS 55
KTS RUDDER PEDAL STOP ENGAGES 51 KTS DISENGAGES.
MISC 50 P/N 407440-011-103 M/R MAST ASSEMBLY S/N: BP19,T TT: 823.2 $3,112.61
INSPECT AND REPAIR AS NECESSARY.
MISC 60 P/N 407-023-003-105 FINLETT ASSEMBLY S/N: BP258 $660.00
REQUESTING PAINTING OF FINLETT IN ACCORDANCE WITH BHT-
407-SPM
Regular hour 190.48 Regular Total $20,190.88
Overtime hour 77.13 Ohime Total $12,263.67
Consumables $250.00
Freight Charge: $905.00
Discount -$2,227.40
Price Grand total $78.311.10
EFTA01120075
Edwards Rotorcraft Solutions, Inc.
Art a
2011 South Perimeter Road, Suite L .K
Fort Lauderdale, Florida 33309
Phone Fax: Email:- Edwards Rotorcraft Solutions, Inc.
Thursday, April 05, 2012
CO3486FL
FREEDOM AIR, INC Make / Model: BELL 407
Serial Number: 53375
Registration: N491GM
Total Time: 823.2
Item Description PARTS LABOR HRS LABOR $$
COMPLY WITH FAA AD2005-03-07 EFFECTIVE MARCH 17TH, 2005
Complied with FAA AD2005-03-07 Effective March 17th, 2005 (Landing gear
crosstubes) and BHT ASB407-03.59 Dated October 15th, 2003 (All forward and aft
1 crosstube assemblies, part numbers as described below, assignment of RIN
(retirement index number) to) in accordance with AD and ASB Instructions. RIN
count assigned as 79 for each crosstube as of date of installation.
(PERFORM POWER ASSURANCE CHECK IN ACCORDANCE WITH BHT-4O7-FMS-3, SECTION 4
2 Performed power assurance check in accordance with BHT-407-FMS-3 Section 4.
Engine calculated at; (+ 12).
(COMPLY WITH FAA AD2O11-25-O1 EFFICTIVE JANUARY 17TH, 2012
Complied with FAA AD2011.25.01 Effective January 17th, 2012 (Apical Industries
3 Emergency Floatation Kit) in accordance with AD Instructions. Not applicable due
to configuration of aircraft. Apical kit not installed.
(PERFORM 12 MONTH TEST IN ACCORDANCE WITH 14CFR PART 91§91.2O7(D) ON ELT SYSTEM
Performed 12 month test in accordance with 14CFR Part 91 §91.207(d) on ELT
4
system. Battery due replacement; March 2015
PERFORM 100 HOUR LIMITATION INSPECTION IN ACCORDANCE WITH BHT-407-MM-1, TABLE 4-2 ON YOKE ASSEMBLY
Performed 100 hour limitation inspection in accordance with BHT-407-MM-1 Table 4-
5
2 on Yoke assembly
(PERFORM 300 HOUR / 12 MONTH INSPECTION IN ACCORDANCE WITH BHT-407-MM-1 SECTION 5-12 THRU 5-18
Performed 300 hour / 12 month inspection in accordance with BHT-407-MM-1
6 Sections 5-12 through 5-18. Operational check, leak check, and dynamic balance of
tail rotor system performed satisfactorily.
EFTA01120076
!PERFORM 150 HOUR INSPECTION IN ACCORDANCE WITH BHT-407-MM-1 SECTION 5 18A ON ENGINE CONTROLS
Performed 150 hour inspection in accordance with BHT-407-MM-1 Section 5.18A on
7
Engine controls. Work performed under Item No 6
'PERFORM 300 HOUR INSPECTION FOR OPTIONAL EQUIPMENT ON PARTICLE SEPARATOR, ROTOR BRAKE, DUAL CONTROL
Performed 300 hour inspection for optional equipment in accordance with BHT-
8
407-MM-1 Section 5-19 on Particle separator, Rotor brake, and Dual control.
!PERFORM 300 HOUR, 300 HOUR OR 12 MONTH AND 25 MONTH INSPECTION ON AUXILIARY FUEL SYSTEM
Performed 300 hour, 300 hour or 12 month, and 24 month inspections in
9 accordance with BHT-407-MM-1 Section 5-19 and BHT-407-MMS-6 Sections 5-3 and 5-4
on Auxiliary fuel system. Operational and leak checks performed satisfactorily.
!PERFORM 600 HOUR INSPECTION ON ROTOR BRAKE AND MAIN ROTOR FRAHM
Performed 600 hour inspection in accordance with BHT-407-MM-1 Section 5-20 on
10 Rotor brake and Main rotor Frahm. Operational and leak checks performed
satisfactorily.
'PERFORM 600 HOUR OR 6 MONTH INSPECTION ON MAIN ROTOR HUB AND BLADE
Performed 600 hour or 6 month inspection in accordance with BHT-407-MM-1
11
Section 5-21 on Main rotor hub and blade
'PERFORM 12 MONTH INSPECTION IN ACCORDANCE WITH BHT-407-MM-1, SECTION 5-22
Performed 12 month inspection in accordance with BHT-407-MM-1 Section 5-22.
Operational checks, leak checks, post ground run special Inspection on lower cone,
12
and dynamic balance of main rotor system performed satisfactorily. Special
inspection required In 1 - 5 flight hours on lower cone.
!PERFORM 300 HOUR SPECIAL INSPECTIONS IN ACCORDANCE WITH BHT-407-MM-1, TABLE 5-3
Performed 300 hour special inspections in accordance with BHT-407-MM-1 Table 5-3
13 on Tail rotor gearbox, Tail rotor driveshaft disc pack couplings, Tail rotor hub mast
nut, Tailboom attachment hardware, Swashplate tilt friction. Swashplate friction
'PERFORM 12 MONTH COMPONENT INTERIM INSPECTION ON MAST POLE
Performed 12 month component interim inspection in accordance with BHT-407-
MM-1 Table 5.4 on Mast pole. Post ground run special inspection performed
14
satisfactorily. Special inspection required between 1 - 5 flight hours in
accordance with BHT-407-MM-1 Table 5-3 on Main rotor mast nut.
!PERFORM 12 MONTH OR 500 FLIGHT HOUR INSPECTION ON EMERGENCY FLOATATION SYSTEM
Performed 12 month or 500 flight hour inspection in accordance with BHT-407-MMS
15 1
on Emergency floatation system.
EFTA01120077
I PERFORM DAILY AND 100 HOUR LIMITATION INSPECTIONS IN ACCORDANCE WITH BHT-407-MM-1, TABLE 4-2
Performed Daily and 100 hour limitation inspections in accordance with BHT-407-
MM-1 Table 4-2 and BHT ASB407-07-80 Parts Ill and IV Dated August 27th, 2007
16
(Tai!boom assembly 407-030-801-107, and 407-530-014-101/-103, New inspection
renuirements) on Tailboom assembly.
I PERFORM 206 SERIES 100 HOUR OR 90 DAY CORROSION INSPECTION IN ACCORDANCE WITH CSSD-PSE-87-001
Performed 206 Series 100 hour or 90 day corrosion inspection in accordance with
17
CSSD-PSE-87.001 Section 30-5
I PERFORM 300 HOUR SERVICING REQUIREMENTS ON AIRFRAME FUEL FILER
Performed 300 hour servicing requirements in accordance with BHT-407-MM-2
18 Table 12-1 on Airframe fuel filter. Replaced fuel filter kit with new item p/n;
1743645-03. Operational and leak checks performed satisfactorily.
I PERFORM 300 HOUR INSPECTION AND LUBRICATION REQUIREMENTS IN ACCORDANCE WITH BHT-407-MM-2
Performed 300 hour inspection and lubrication requirements in accordance with
BHT-407-MM-2 Table 12.2 and BHT A5B407-04.63 Revision B Parts IV and V Dated
19 September 5th, 2006 (Tail rotor driveshaft bearing 407-340-339-101/-103,
Replacement of) on Tail rotor driveshaft and oil cooler blower hangar bearings.
acre is Ananr fnr cee ernrine_inm7 ore EMI
I PERFORM 25 HOUR, 50 HOUR/3 MONTH, 150 HOUR, 300 HOUR AND 300 HOUR/3 MONTH LUBRICATION REQUIREMENTS
Performed 25 hour, 50 hour / 3 month, 150 hour, 300 hour, and 300 hour / 3 month
lubrication requirements in accordance with BHT-407-MM-2 Table 12-2 on Litter
20 door seal, Swashplate bearings, Pitch change link bearings, Tail rotor driveshaft
splines, Hydraulic pump drive, and Tail rotor pitch change mechanism. Special
inspection required between 10 - 25 flight hours on Tail rotor driveshaft disc pack
!PERFORM 300 HOUR/12 MONTH SERVICING REQUIREMENTS IN ACCORDANCE WITH BHT-407-MM-2, TABLE 12-3
Performed 300 hour/ 12 month servicing requirements as detailed. Serviced
transmission and tail rotor gearbox oil systems with oil; Royco 555. Serviced
21 hydraulic oil system with oil; MIL-H-5606. Replaced transmission filter with new
item p/n; 204.040.760.109. Replaced hydraulic filters with new items p/n; 206-076-
340-003. Operational and leak checks performed satisfactorily.
'PERFORM MISCELLANEOUS SERVICING REQUIREMENTS IN ACCORDANCE WITH BHT-407-MM-2
Performed miscellaneous servicing requirements in accordance with BHT-407-MM-2
22 Paragraphs 12-45, 12-47, 12-54, and 12-55 on Battery, Fire extinguisher, Windshield
and windows, and Oil cooler blower impeller. Operational check performed
!PERFORM 50 HOUR, 100 HOUR AND ANNUAL INSPECTION ON AIR CONDITIONING SYSTEM
Performed 50 hour, 100 hour, and Annual Inspections in accordance with Air
23 Comm. Instructions for Continued Airworthiness Report 407EC-200M-2 on Air
'PERFORM ANNUAL INSPECTION IN ACCORDANCE WITH AIR COMM INSTRUCTIONS FOR CONTINUED AIRWORTHINESS
Performed Annual inspections in accordance with Air Comm. Instructions for
24 Continued Airworthiness Reports 407H-200M-2 and 407H-500M-1 on Cabin heater
system and Engine compartment bleed air system. Operational checks performed
EFTA01120078
'PERFORM 300 HOUR / ANNNUAL INSPECTION ON FLITESTEP / FLOATSTEP KIT
Performed 300 hour / Annual inspection in accordance with Aeronautical
25 Accessories, Inc. Instructions for Continued Airworthiness Report AA-01162 on
Flitestep / Floatstep kit
'PERFORM ANNUAL INSPECTION ON HIGH VISIBILITY CREW DOOR KIT
Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
26 instructions for Continued Airworthiness Report AA-01072 on High visibility crew
rtnnr Int
'PERFORM ANNUAL INSPECTION PRE-FLIGHT STEP / HANDLE
Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
27 Instructions for Continued Airworthiness Report AA-00123 on Pre-flight step /
handle
'PERFORM ANNUAL INSPECTION ON FLODING MAINTENANCE STEP
Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
28 Instructions for Continued Airworthiness Report AA-0126 on Folding maintenance
IPERFORMM 300 HOUR / ANNNUAL INSPECTION ON CROSSTUBES
Performed 300 hour / Annual inspection in accordance with Aeronautical
29 Accessories, Inc. instructions for Continued Airworthiness Report AA-00061 on
IPERF kiM4OUR / 6 MONTH INSPECTION ON SKID TUBES
Performed 100 hour / 6 month inspection in accordance with Aeronautical
30 Accessories, Inc. Instructions for Continued Airworthiness Report AA-01141 on Skid
tubes
'PERFORM ANNUAL INSPECTION ON TAIL ROTOR PEDAL LOCKOUT KIT
Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
31 instructions for Continued Airworthiness Report AA-99032 on Tail rotor pedal
Inrkniit kit
'PERFORM ROUTINE INSPECTION IN ACCORDANCE WITH BRISTOL AEROSPACE LIMITED INSTRUCTIONS
32 Instructions
Performed routine inspection in accordance with Bristol Aerospace Limited
for Continued Airworthiness Report ER 95008
'PERFORM 150 HOUR AND 300 HOUR / 12 MONTH ENGINE INSPECTIONS
7830
[ o oRromllesdRo1y5Oceh2o5uor and 00hro
autiro/n12month engine inspections in accordance
33 With c4 pe and Maintenance Manual Section 72-00-00
Table 606. Operational and leak checks performed satisfactorily.
IPERF RM 600 H0UR/12 MONTH SERVICING REQUIREMENTS
Performed 600 hour / 12 month servicing requirements on Engine oil and CEFA
filter systems. Serviced engine oil system with oil; Mobil 254. Replaced CEFA oil
34 filter with new item p/n; 23066697. Servicing, filter replacement, operational
checks, and leak checks performed under Item No. 33
EFTA01120079
'COMPLY WITH FAA AD2011-15-51 EFFECTIVE NOVEMBER 14TH, 2011
Complied with FAA AD2011.15-51 Effective November 14th, 2011 (Hydraulic servo
assemblies) and BHT ASB407-11-96 Revision B Dated August 29th, 2011 (Clevis
35
Assembly - hydraulic servo assemblies, Part number 206.076.062-105 and 206-076-
062-107) in accordance with AD and ASB Instructions.
COMPLY WITH BHT ASB407-11-94 DATED FEBRUARY 8TH, 2011
Complied with BHT ASB407-11.94 Dated February 8th, 2011 (Main rotor mast 407-040-
038.101, -105, -109, -111, -111R, -111T, or -11111, Inspection of) in accordance with
36
ASP Instructions. Operational and leak check performed satisfactorily. Next due
compliance in 12 months.
(EME GENCY FLOATATION SYSTEM RESERVOIRS DUE RETIREMENT
Replaced emergency float system reservoirs with new items p/n; 1271762 s/n; 4353
and 4348 DOM; September 2011. Replaced fwd clamp for left hand reservoir with
37
new Item. Serviced reservoirs to; 3025 psi at 30 °C. Leak checks performed
satisfactorily. Work performed in accordance with BHT-407-MMS-1
'FORWARD RIGHT HAND FLOAT BAG COVER TORN
Replaced Forward Right hand float bag cover with new item p/n; 206-050-247-131 in
38
accordance with BHT-407-MMS-1
'CORROSION NOTED IN AREA OF OIL COOLER DRAIN
Performed repair of oil cooler deck drain in accordance with BHT-ALL-SPM and BHT-
39
ALL-SRM. Protective finish re-applied.
'AIRCRAFT MAIN BATTERY FAILS CAPACITY CHECK THREE 13) TIMES. REQUEST REPLACEMENT
Replaced aircraft main battery with new item p/n; RG-407 s/n; 40484086 in
40 accordance with BHT-407-MM Chapter 96 and Concorde Installation instructions.
Operational check performed satisfactorily.
'STARTER GENERATOR BRUSHES WORN
Replaced starter generator brushes with new items p/n; M2002-1 (x4) in accordance
41
with BHT-407-CR&0-V Chapter 96. Operational check performed satisfactorily.
'PITCH SHOCK CORDS EXCESSIVELY STRETCHED
Replaced pitch control spring shock cords with new items p/n; 407-001-116-101 (x2)
42
in accordance with BHT-407-MM Chapter 67
(TAIL ROTOR PITCH HORNS CORRODED BEYOND PERMISSIBLE LIMITATIONS
Replaced tail rotor pitch horns with new items p/n; 406-012-108-107 (x2) in
43
accordance with BI-IT-407-MM Chapters 64 and 67.
MAIN ROTOR BRAKE LININGS AND BOLTS WORN / DAMAGED. TO BE REPLACED
Replaced rotor brake linings and guide bolts with new items p/n; D0314-1 (x4) and
44 p/n; D0164-1 (x4) respectively in accordance with BHT-407-CR&O-V Chapter 63. Leak
and operational checks performed satisfactorily.
EFTA01120080
'AIR CONDITIONING DRIVE BELT WORN EXCESSIVELY
Replaced air conditioning system drive belt with new item p/n; 7270 in accordance
45 with Air Comm Corporation Service Manual 407EC-200M-2. Operational check
performed satisfactorily. Belt tension check required after 2 hours of operation.
'CORROSION ON LEFT HAND AUXILIARY FINLET ABOVE POSITION LIGHT
J.,Replaced left hand auxiliary fin due to excessive corrosion with new item p/n; 407-
46 023.003.105 s/n; BP258 in accordance with BHT-407-MM Chapter 53. Operational
checks performed satisfactorily.
'PAR CLE SEPARATOR CORRODED ON UPPER LEFT HAND SIDE
Mechanically removed corrosion to particle separator in accordance with BEIT-ALL-
47
SPM. Protective finish re-applied.
'ENGINE COWLING CORRODED ON UPPER SURFACE
Mechanically removed surface corrosion from affected area of engine cowling
48
exhaust cover panel in accordance with BHT-ALL-SPM. Protective finish re-applied.
'UPPER AND LOWER WIRE STRIKE KITS CORRODED
Mechanically removed corrosion on upper and lower wire strike blades in
49
accordance with BHT-ALL-SPM. Protective finish re-applied.
'ENGINE ACCESSORY GEARBOX CASING CORRODED AT 12 ° CLOCK POSITION
Performed repair to engine accessory gearbox at 12 o'clock position in accordance
50
with Rolls-Royce 250-C47 Series Overhaul Manual Section 72-60-00
'LEFT HAND BOOST PUMP SWITCH INOPERATIVE
Replaced left hand fuel boot pump switch with new item p/n; 407-362-013-103 in
51 accordance with BHT-407-MM Chapters 28 and 96. Operational and leak checks
performed satisfactorily.
'COMPLY WITH BHT-ASB407-07-79 REV A DATED JUNE 7TH, 2011
Complied with BHT ASB407.07.79 Rev A Dated June 7th, 2011 (Freewheel aft seal 209-
340-265-103, Installation procedures improvement of and oil dam ring 406-040-547-
52
103, one time verification) in accordance with ASB Instructions. Operational and
leak checks performed satisfactorily.
"OPERATOR REQUESTS REPLACEMENT OF NUTPLATES (X2) ON PARTICLE SEPARATOR COWLING FOR EJECTOR COVER PLATES
Replaced nutpiates for particle separator exhaust cover plates with new items p/n;
53
SL211-3.1 (x2) in accordance with BHT-407-MM Chapter 71.
'PERFORM 1-5 FLIGHT HOUR SPECIAL INSPECTION ON M/R HUB MAST NUT AND M/R HUB LOWER CONE
Performed 1 - 5 flight hour special inspection in accordance with BI-IT-407-MM
54 Table 5-3 on Main rotor hub mast nut and Main rotor hub lower cone. No
movement noted.
EFTA01120081
'PERFORM 2 HOUR OF OPERATION TENSION CHECK ON AIR CONDITIONING SYSTEM DRIVE BELT
Performed 2 hours of operation tension check in accordance with Air Comm
55 Corporation Service Manual 407EC-200M-2 on Air conditioning system drive belt.
Total Parts and Outside Services $46,928.95
I
Consumables S250.00
Freight Charges 5905.00
Discount -$2,227.40
Sub-Total S45,856.55 0 S32,454.55
TOTAL $78,311.1O
ℹ️ Document Details
SHA-256
7c9868c9d38a7e8a815c67b5eb53b4e584ad2bf0b294f5f16ef9b8fdd932ae06
Bates Number
EFTA01120072
Dataset
DataSet-9
Document Type
document
Pages
10
Comments 0