Three B's LLC
4600 Lincoln rd. NE
Albuquerque, NM 87109
Lic.# 83498
Invoice
Brice Gordon
do Zorro Ranch
Stanley, New Mexico
Brice,
Here is the price for lowering the fountain in the Estancia
Phase 1
Support fountain bowl with I-beams and heavy duty material lifts (4)
Saw cut grout joint
Raise bowl and remove middle piece of fountain
Lower bowl and set into place for owner to approve
Phase 2
Support fountain bowl with I-beams and heavy duty material lifts (4)
Raise fountain and apply grout
Lower fountain and level
Fill bowl to check for uniformity of water flow around the perimeter of bowl. Some
grinding may need to be done to achieve water flow.
Project should take about 3 day's total
Includes; material, labor, equipment to complete project
Excludes; electrical and plumbing
Price $ 2,450.00 plus tax
Total $ 2,621.50
**We had additional labor, materials and equipment rentals to lower the bowl to its final
position after meeting with Mr. Epstein. $1,180.00 plus tax
Total $1,262.00
Final total $ 3,383.00
Call me if you have any questions at
Thank you,
JJ Blea
EFTA00731690
Managing Member
EFTA00731691
ℹ️ Document Details
SHA-256
7ccba93cace7aeec5709f422a24f2edad6640e4e287b47b3c031ba71d9aa0112
Bates Number
EFTA00731690
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0