EFTA01828532.pdf

DataSet-10 1 page 134 words document
V15
👁 1 💬 0
📄 Extracted Text (134 words)
To: Brice Gordon Fran: Jeffrey Epstein Sent Wed 6/17/2009 5:56:32 PM Subject Re: Conduit Bank Approval. this is a doug issue On Wed, Jun 17, 2009 at 2:04 PM, Brice Gordon a wrote: To: JEE Attached is a proposal for a 250ft extension of the 10 Pipe Conduit bank to the new Electrical building. After reviewing with Tom and Doug ,1 would like to submit the above proposal for your review/approval The first leg was installed (early 2006) prior to cement plant installation Tom is now trenching for the new electrical supply to mechanical building. Proposed 10 pipe Conduit bank is for the future build out of the existing compound and if this work is not performed at this time we are effectively abandoning existing Conduit bank. Amount: $21,610.00 Brice EFTA_R1_O 0204 009 EFTA01828532
ℹ️ Document Details
SHA-256
7f34ba0309bbd607ece9ce9c009519685995c8f5616267e8e18f0d2535b908bb
Bates Number
EFTA01828532
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!