EFTA02021204.pdf
👁 1
💬 0
📄 Extracted Text (74 words)
From: aate: March 29, 2010 2:08:00 PM GMT-04:00 To:
[email protected] Subject: Wet paneling
In order to resolve our dispute over the wood paneling, we will come to the
Island within 14 days to finish the
paneling. This is with the understanding that we have advised you that to perform
the finishing work, at this time, given the moisture level of the wood, would
result in harm to the wood and surrounding structures.
EFTA_R1_00526869
EFTA02021204
ℹ️ Document Details
SHA-256
7f8989b6d9b59e356580890ddaeadc7a290833e379e8805af53792eaddb8d8b1
Bates Number
EFTA02021204
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0