EFTA00905978.pdf

DataSet-9 1 page 185 words document
👁 1 💬 0
📄 Extracted Text (185 words)
From: jeffrey epstein <jeevacation®gmail.com> To: ' Subject: Re: GII update Date: Wed, 02 Mar 2011 21:33:18 +0000 Thanks Sony for all the typos .Sent from my iPhone On Mar 2, 2011, at 1:22 PM, wrote: Jeffrey, Gulfstream is planning to work APU and boost pump on second shift today at 3pm, Quality Control is researching and hopes to approve the T-Stat install that I brought with on plane, the paper work that came with the Tstat is 1970 build date, three other Tstat's are listed in parts data base system, but are not ready to ship since they are waiting bench testing,. There is also a pressure test of pneumatic system for Tstat, Gulfstream is checking to see if this break out box is on hand in Long Beach,. -Boost pump issue's will be addressed by Avionics tonight,. suspect corrosion on canon plug in wheel well, and filter down stream of pump,. are area's we are looking, in addition to Circuit Breaker integrality, 50amp,. If you approve of below floor inspection in Long Beach, Gulfstream can start Thursday,. I will keep you posted, thanks, EFTA00905978
ℹ️ Document Details
SHA-256
7fe9e34053048bb51b95f19d1303924b964c2ede914d83f411f1401f47f3ed43
Bates Number
EFTA00905978
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!