EFTA02488882.pdf

DataSet-11 1 page 172 words document
V11
👁 1 💬 0
📄 Extracted Text (172 words)
From: Daphne Wallace < Sent: Wednesday, September 9, 2015 4:13 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Boyson schedule - September 9, 2015 Greetings Sir, Anna and I just received=a phone call from Boyson. The parts they are waiting on to repair th=ir second engine will not be available until next week. As a result, they can only transport lighter loads. Anna=has prioritized getting the trash, gravel, sand, topsoil and waste oil rem=val completed as soon as possible. Boyson cannot =arry the weight of the crusher run volume that is needed to complete the R=ad project, nor the asphalt, until both engines are back online. To make matters worse, they are scheduled to put the =arge into drydock beginning 9/18 for approximately 10 days. =/div> We will concentrate on maximizing the crucial loads needed to ke=p the present projects going and prepare for your return, and next week si= with Mr. Jeffers and Big Sam to create a new Road Schedule for your revie=. Respectfully, Daphne 1 EFTA_R1_01609128 EFTA02488882
ℹ️ Document Details
SHA-256
8089a46e741d759078a1c179914dacd35842bb62567a689aaf5ca5b17a938c4c
Bates Number
EFTA02488882
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!