EFTA02488882.pdf
👁 1
💬 0
📄 Extracted Text (172 words)
From: Daphne Wallace <
Sent: Wednesday, September 9, 2015 4:13 PM
To: Jeffrey Epstein
Cc: ann rodriquez; Rich Kahn
Subject: Boyson schedule - September 9, 2015
Greetings Sir,
Anna and I just received=a phone call from Boyson. The parts they are waiting on to repair th=ir second engine will not
be available until next week.
As a result, they can only transport lighter loads. Anna=has prioritized getting the trash, gravel, sand, topsoil and waste
oil rem=val completed as soon as possible.
Boyson cannot =arry the weight of the crusher run volume that is needed to complete the R=ad project, nor the asphalt,
until both engines are back online.
To make matters worse, they are scheduled to put the =arge into drydock beginning 9/18 for approximately 10 days.
=/div>
We will concentrate on maximizing the crucial loads needed to ke=p the present projects going and prepare for your
return, and next week si= with Mr. Jeffers and Big Sam to create a new Road Schedule for your revie=.
Respectfully, Daphne
1
EFTA_R1_01609128
EFTA02488882
ℹ️ Document Details
SHA-256
8089a46e741d759078a1c179914dacd35842bb62567a689aaf5ca5b17a938c4c
Bates Number
EFTA02488882
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0