📄 Extracted Text (152 words)
From: Leighton Allenby <I
To: Janusz Banasiak
Cc: Rich Kahn Jeffrey Epstein <[email protected]>,
Leighton Allenby
Subject: Re: Pavers
Date: Fri, 14 Aug 2015 18:40:32 +0000
Attachments: IMG 0939.JPG
That isn't correct
They need to remove the stones and do this correctly
I. remove stones
2. clean debris off stone
3. mix with their epoxy before putting into hole / mushy mixture
4. fill joints with mixture and compact real tight/smooth to top of pavers.
Perhaps we should bring in another contractor if they cannot look at the aesthetic side of the application.
Leighton Allenby
Director of Pro erties
On Fri, Aug 14, 2015 at 2:29 PM, Janusz Banasiak > wrote:
Hi Leighton the were here today.Pour more sealer stay on surface for a while and going down.will order heavy
thickness on Monday will call me and let me know.have told me it is hard to find one.
Sent from my iPhone
EFTA00662540
ℹ️ Document Details
SHA-256
81997324d2580da35b66d0c20074ae7d790975c8357eabf5bc26d30c51a6d2b6
Bates Number
EFTA00662540
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0