EFTA02441973.pdf

DataSet-11 1 page 167 words document
👁 1 💬 0
📄 Extracted Text (167 words)
To: [email protected][[email protected]] From: Silvina Royston Sent: Tue 4/28/2009 1:41:52 AM Subject: Re: Helipad Update Jeffrey, Yes, the little house will be demoed and we will build across the road where the purple wall was, pending earth management on Mechanical Building side. Silvina Original Message From: Jeffrey Epstein <'eevacation@ mail.com> To: Silvina Royston Sent: Mon Apr 27 18:30:31 2009 Subject: Re: Helipad Update what existing building the little house? if so the gensler plan already has it„ but the issue was the downdraft on landing blowing inotthe building On Mon, Apr 27, 2009 at 5:42 PM, Silvina Royston wrote: Jeffrey, I've been in touch with Bob Anderson at Gensler regarding the Helipad design. I've been updating him with existing conditions. Bob had questions re: the required lighting and area Larry requires for landing. Brice reviewed with Larry whose advice is to locate the new ATV Garage not where the existing building is but across the road from it. Bob is working on this scheme. Regards, Silvina EFTA_R1_01516735 EFTA02441973
ℹ️ Document Details
SHA-256
8252d9d2bc6da647eae4cbf38f4969c51d787713b3449e27df7c2a8d16561a8d
Bates Number
EFTA02441973
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!