To: Jeffre E tein 'eevacation mail.com
Cc:
thomas melnick(1
L MOI1 11.11
Sent Thur 11/17/2011 2:23:39 PM
Subject Re:
The wall by the bench needed to have a sprinkler head moved and plants moved to accommodate
the wall. That will be done today. We did not want to disrupt the border on the tile so we are
building the wall from the dirt level up. Is that ok?
Mosaic light are not done as there is air ducts where the light s are supposed to do and Gary
needs to do measurements to sec if there is enough room. He has been focusing on getting the
relax room bathroom and cabana 4 electrical completed.
Main engineering road not done yet, let me follow up with Tom on timing.
Let me check on the boulders
On Nov 17, 2011, at 9:39 AM, Jeffrey Epstein wrote:
i do not see the little wall at my bench outsdie by bedroom igala said it would be
done the day after i left. .. did ht lights above the mosaic , get done. the lights in
the coridors near the breezeway door.s// did the main road get engineered yet. ?
did julcs store boulders nearby for the rip rap road on the service entry/library
*************************** ****** **************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to ices acationpgmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00247182
EFTA01852314
ℹ️ Document Details
SHA-256
82bcd2fef8631bd9bbebbaf268b80d68d7d38de1b804ff134e80c0948610a053
Bates Number
EFTA01852314
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0