EFTA02716066.pdf

DataSet-11 3 pages 512 words document
👁 1 💬 0
📄 Extracted Text (512 words)
From: Brice Gordon < Sent: Friday, October 2, 2015 12:46 AM To: jeffrey E. Subject: Re: ZDC PB and Log Cabin Attachments: LC1JPG; LC2JPG; LC3.JPG; LC4JPG; LCS.JPG; LC6JPG; LC7JPG; LC8JPG; LC9JPG; LC10JPG; LC11JPG; LC12JPG; LC13JPG Jeffrey E. 12:00 AM (11hours ago) =font color="#0000fr> to me, Richard how long to make level with the plan i produc=d originally for grading. i assume much of the work can get do=e whetehr you are there are not. i will come out late o=tober . to mark out beds so i hope grading finshed by then Jeffrey Anticipate=completion of Log Cabin last week of September, and then planned to re mob=lize to MH Project E mail and Photos of =rogress at Log Cabin to follow We will try to meet that deadline, Remind=r its a 9 plus foot retaining wall, backfill for 80 percent of area involv=d, compaction, An issue that needs to be addressed, Drainage, under the present plan/grade, in the event =f a down pour proposed path material and small landscape walls will get wa=hed away regards Brice On Wed, Sep 2, 2015 =t 11:26 AM, Zorro Ranch < <mailto > wrote: Ok Confirming =e will concentrate on log cabin until we get design confirmation for New g=rden at main house Thank you Brice Sent from my iPhone On Sep 2, 2015, at 10:58 =M, jeffrey E. <[email protected] <mailto:[email protected]» wrote: do not hold off. her visit is not very impo=tant to me On Wed, Sep 2, 2015 at 12:11 PM, Brice Gordon < gt; wrote: EFTA_R1_02150932 EFTA02716066 Jeffrey Staging material, rocks and dirt at the =og cabin have scheduled for today and tomorrow I intended to hold off on any other work a= that location until after visit 14th Sept We have been stock piling dirt for back fill=and grade MH, unfortunately the track hoe broke down It has been returned, company was un=ble to locate part. Another unit has been found from another company, we are waitin= for confirmation on delivery date, Monday or Tuesday next week. In the mean time the access road b=hind the MH to proposed new site needed work and a slight change of layout=so dump truck was not continually driving over Spetic Tanks located to the=South East of Mechanical Building. The storm water pipping from the MH that goes un=er this road also need work, this work has been completed. I will send Photos Friday of progr=ss <=iv class="gmail_default" style="font-size:small">regards Brice Brice Gordon Stanley, NM Ph: <tel:%28505%29%20934%202809> =C2 please note The informat=on contained in this communication is confidential, may be attorney-cli=nt privileged, may constitute inside information, and is intended only =or the use of the addressee. It is the property of JEE Unauthoriz=d use, disclosure or copying of this communication or any part thereof =s strictly prohibited and may be unlawful. If you have received this return e-mail o= by e-mail to [email protected] <mailto:[email protected]> , and destroy this communication and all copies =hereof, including all attachments. copyright -all rights reserved </=iv> 2 EFTA_R1_02150933 EFTA02716067 =rice Gordon Stanley, NM Ph:= <tel:%28505%29%20934%202809> =div class="gmail_signature"> Stanley, NM Ph= 3 EFTA_R1_02150934 EFTA02716068
ℹ️ Document Details
SHA-256
83cf8ca1f546ecc7637236448290ae189e3b3219ca9e1f7c341a700dc9533707
Bates Number
EFTA02716066
Dataset
DataSet-11
Type
document
Pages
3

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!