👁 1
💬 0
📄 Extracted Text (512 words)
From: Brice Gordon <
Sent: Friday, October 2, 2015 12:46 AM
To: jeffrey E.
Subject: Re: ZDC PB and Log Cabin
Attachments: LC1JPG; LC2JPG; LC3.JPG; LC4JPG; LCS.JPG; LC6JPG; LC7JPG; LC8JPG; LC9JPG;
LC10JPG; LC11JPG; LC12JPG; LC13JPG
Jeffrey E.
12:00 AM (11hours ago)
=font color="#0000fr>
to me, Richard
how long to make level with the plan i produc=d originally for grading. i assume much of the work can get do=e
whetehr you are there are not. i will come out late o=tober . to mark out beds so i hope grading finshed by then
Jeffrey
Anticipate=completion of Log Cabin last week of September, and then planned to re mob=lize to MH Project E mail and
Photos of =rogress at Log Cabin to follow
We will try to meet that deadline,
Remind=r its a 9 plus foot retaining wall, backfill for 80 percent of area involv=d, compaction,
An issue that needs to be addressed,
Drainage, under the present plan/grade, in the event =f a down pour proposed path material and small landscape walls
will get wa=hed away
regards Brice
On Wed, Sep 2, 2015 =t 11:26 AM, Zorro Ranch < <mailto > wrote:
Ok
Confirming =e will concentrate on log cabin until we get design confirmation for New g=rden at main house Thank you
Brice Sent from my iPhone
On Sep 2, 2015, at 10:58 =M, jeffrey E. <[email protected] <mailto:[email protected]» wrote:
do not hold off. her visit is not very impo=tant to me
On Wed, Sep 2, 2015 at 12:11 PM, Brice Gordon < gt; wrote:
EFTA_R1_02150932
EFTA02716066
Jeffrey
Staging material, rocks and dirt at the =og cabin have scheduled for today and tomorrow
I intended to hold off on any other work a= that location until after visit 14th Sept
We have been stock piling dirt for back fill=and grade MH, unfortunately the track hoe broke down
It has been returned, company was un=ble to locate part.
Another unit has been found from another company, we are waitin= for confirmation on delivery date,
Monday or Tuesday next week.
In the mean time the access road b=hind the MH to proposed new site needed work and a slight change
of layout=so dump truck was not continually driving over Spetic Tanks located to the=South East of Mechanical Building.
The storm water pipping from the MH that goes un=er this road also need work, this work has been
completed.
I will send Photos Friday of progr=ss
<=iv class="gmail_default" style="font-size:small">regards Brice
Brice Gordon
Stanley, NM
Ph: <tel:%28505%29%20934%202809>
=C2 please note
The informat=on contained in this communication is
confidential, may be attorney-cli=nt privileged, may
constitute inside information, and is intended only =or
the use of the addressee. It is the property of
JEE
Unauthoriz=d use, disclosure or copying of this
communication or any part thereof =s strictly prohibited
and may be unlawful. If you have received this
return e-mail o= by e-mail to [email protected] <mailto:[email protected]> , and
destroy this communication and all copies =hereof,
including all attachments. copyright -all rights reserved
</=iv>
2
EFTA_R1_02150933
EFTA02716067
=rice Gordon
Stanley, NM
Ph:= <tel:%28505%29%20934%202809>
=div class="gmail_signature">
Stanley, NM
Ph=
3
EFTA_R1_02150934
EFTA02716068
ℹ️ Document Details
SHA-256
83cf8ca1f546ecc7637236448290ae189e3b3219ca9e1f7c341a700dc9533707
Bates Number
EFTA02716066
Dataset
DataSet-11
Type
document
Pages
3
💬 Comments 0