U.S. Department of Justice
Federal Bureau of Prisons
Metropolitan Correctional Center
New York, New York 10007
July 17, 2019
MEMORANDUM FO REGIONAL DIRECTOR
FROM: arden
SUBJECT: Request of B&F Project Asbestos Removal
This is a request to establish a B&F project in the amount of
$100,000.00, in order fora contractor to remove asbestos. There were
multiple surveys done dating back from 2009 to present. The surveys
have identified multiple areas throughout the institution that have
tested positive for asbestos.
Attached are the Schedule of Cost Input (SCI), and Government Estimate
(IGE).
Please feel free to contact me if you have any questions.
Attachments
EFTA00142448
FAC 2.6 - Independent Government Estimate (IGE)
Date 7/17/2019 Request Intial
Institution MCC New York Category General Improvements
Project Title Asbestos Removal
Object Class
Category Man-Hours
25 (Contract) 26 (In-House)
1 General Requirements $60,000.00 160
2 Sitework
3 Concrete
4 Masonry
$ Metals
a. Structural
b. Miscellaneous
6 Wood & Plastic
7 Thermal & Moisture Protection $10,000.00 160
a. Insulation
8 Doors & Windows
9 Finishes $10,000.00 160
a. Paint
b. Flooring
c. Ceiling
d. Other
10 Specialties 520,000.00 120
11 Equipment
12 Furnishings
13 Special Construction
14 Conveying Systems
15 Mechanical
a. Plumbing
b. HVAC
16 Electrical
a. Primary
b. Secondary
c. Lighting
d. Communications
TOTALS: $100,000.00 $0.00 600
Grand Total: $100,000.00
EFTA00142449
FAC 2.5 - Schedule of Cost Input (SCI)
Date 7/17/2019 Request Intial
Institution MCC New York Category General Improvements
Project Title Asbestos Removal
FY19 FY20 FY21
Object Class P05 WY $ x 1000 POS WY $ x 1000 POS WY $ x 1000
11.1 Full-Time Permanent
11.5 Other Personal Compensation
12.1 Personal Benefits: Civilian
21.0 Travel and Transportation of Persons
22.0 Transportation of Things
23.2 Rental Payments to Others
23.3 Communication, Utilities and Miscellaneous Charges
24.0 Printing and Reproduction
25.0 Other Contract Services 19 100.0
26.0 Supplies and Materials
31.0 Minor Equipment
32.0 Land Structures
Total 100.0 0.0 0.0
Total 100.0
Total in Dollars $100,000.00
There are muliple areas within the institution that has been identified by NYS ce ified contractor
which contains abestos. The asbestos files are unintentintally breaking and sepe acing from the
floor in both inmate and vistor ares.
Current
Conditions
MCC New York proposes to hire a contractor to remove all asbestos identified in past and present
surverys. The contractor will also inspect, dean, abate, and dispose of all asbestos contained
therein. The abatement contractor shall certify that the Institution complies with OSHA and HUD
requirements for asbestos thresholds.
a. MCC New York, 150 Park Row, NY
b. N/A
C. N/A
d. N/A
e. N/A
I. RS MEANS
Proposal
g. CONTRACTOR
h. General Requirements (60,000.00), Thermal/Moisture Protection (10,000.00), Finishes (10,000.00),
Specialties (20,000.00).
i. N/A
J. This project will comply with all FBOP Technical Design Guidelines, seismic zone requirements,
environmental compliance, Life Safety, NFPA, ADA-ABA and Federal, State, and Local codes and regulations as
applicable to this project. j. Compliance has been addressed as applicable to this project, inclusive of FBOP
Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA-
ABA, and Federal, State, and Local codes and regulations.
k. N/A
MOP Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NEPA, ADA-ABA, and Federal, State, and Local codes and
regulations have been reviewed or if AGE services are required must all be addressed in the proposal section of this justification.
Page 1
EFTA00142450
ℹ️ Document Details
SHA-256
84326bcb401b52e8c81d4dfd87e69bda095e0a98a86dac2d1c59f8b5e91f85be
Bates Number
EFTA00142448
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0