📄 Extracted Text (414 words)
From: Jeffrey Epstein <[email protected]>
Sent: Friday, April 29, 2011 9:36 PM
To: Warwick Wicksman
Cc: gary
Subject: Re: LSJ Flagpole Pool Images - Email 1 of 2
Warwick„ I am at loss. yes there were =ariations„ however in the past three months, moving the living =oom up and
down is not a real variation.. The circulation that i stated =as a priority , still shows this ridculus dust pan at the end of
the =oad sorry.. its not fair
On Apr 29, =011, at 5:28 PM, Warwick Wicksman wrote:
Jeffrey,
I also attached pattern diagrams based =n this week's emails. These do not =epresent the actual images, just
the areas we would like to =elineate. We need your =eedback on the images first.
Option =: Based on desire for =ain field to be 16x16 coral stone. Placed at 45 degree =ngle. Pool border,
area in =ront of building, and carpet at shade structure would all be larger =attern.
Option =: Similar to Option 2, =ut omitted path from steps to building. I do not think that =rea needs to
be defined. More detailed =attern at the shade structure.
Option =: Similar to Option 3, =ut with a more detailed pattern at detailed pattern at the shade =tructure
and in front of the building.
Please remember that while it is true we were released to start in =ecember, our focus has been shifting back
and forth from the flagpole =rea to the main residence. During this time, =e've provided a design development set of
drawings for the flagpole =ool area building and shade structures - missing only paving for the =eck and landscape. Also,
we have =enerated almost 40 variations of the main residence area, including =pen pools, enclosed pools below living
rooms, numerous terrace layouts, =nd the current pool location version. Both in hand =ketches, cad sketches, and 3d
Sketchup models.
Thanks,
=nbsp; &n=sp; =nbsp; &n=sp;
Warwick Wicksman, =IA
Principal
=nbsp; &n=sp; &nbs=;
Suite 300
Santa Monica, California =0404
USA
<http://www.Gensler.com>
Original =essage
From: Jeffrey epstein =mailto:[email protected]]
Sent: Friday, April =9, 2011 6:12 AM
To: Warwick =icksman
Cc: Garykerney; Darren lndyke
Since december I have asked for a hardscape plan for flagpole pool and =irculation from master to library. The
project is extremely delayed . 3 =onths ago you toldme that you would send images =nd a first pass . To date nothing
received
EFTA_R1_00119050
EFTA01790557
Sorry for all the typos Sent from =y iPhone
<IS) =aving Images - low =es.pdf>
2
EFTA_R1_00119051
EFTA01790558
ℹ️ Document Details
SHA-256
85f00d621cb37b8f349f14d5073ea12ef9666d0ae7aa301ed3d8368eee1337e1
Bates Number
EFTA01790557
Dataset
DataSet-10
Document Type
document
Pages
2
Comments 0