📄 Extracted Text (238 words)
Polymeric Products
1256 5th Street
West Palm Beach FL 33409
Phone
Fax
March 9, 2016
Re: Nautica 42' RIB Demolition Estimate
Dear Mr. Visoski:
As per our meeting yesterday, please find listed below our estimated charges for
removing the rear floor, side & rear boxes, & necessary below deck structure &
equipment from Nautica RIB hull number (HID) PTJ41007K011:
Total Man Hours: 55 @ $85/hr $ 4,675.00
Misc. Equipment & Materials 265.43
Total: $ 4,938.43
For your convenience I will attach the worksheet used to determine these amounts. It
specifies the tasks & materials involved in more detail. As you requested, I will also
email you an invoice. As soon as I get your approval I will assign two men to
immediately start the careful removal of all of the existing structure & equipment, so that
we can more accurately determine what will be required to accomplish your desired
modifications to the cockpit deck structure. It is important that the demolition process is
achieved without harming anything, including wiring, etc. The marking of all wiring, etc.
will also aid the re-rigging of the related systems. We do not plunge into such tasks
without taking all necessary care. Though the price listed above is listed as an
"estimate", it should be totally accurate — unless some unforeseen factor arises. If this
should happen, I will contact you immediately so that we can discuss it.
Sincerely,
Zed Bennett, Pres.
EFTA00584996
ℹ️ Document Details
SHA-256
89604add72bd2ed8abcb152e5677370051703137ad467d8ec2392139f281c1c0
Bates Number
EFTA00584996
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0