EFTA01960321
EFTA01960322 DataSet-10
EFTA01960325

EFTA01960322.pdf

DataSet-10 3 pages 547 words document
P23 P22 V16
Open PDF directly ↗ View extracted text
📄 Extracted Text (547 words)
To: Jeffrey Epsteinueevacationagmail.com]: ann rodriquez From: Daphne Wallace Sent Sat 9/14/2013 9:42:59 PM Subject Re: Rental of Backhoe with hammer - September 14, 2013 Greetings Sir, I have a call in to Jimmy to confirm that he will not need a hammer for the pool project. My understanding was we would use the LSJE equipment to first remove the sod, and then remove soil and level the area until it is 6 inches lower than the present tile level. Regarding the Swing Project, Roy says a rock hammer is needed to complete placing the swing at the kite house. He said that you were to advise the location. I wanted to take advantage of the hammer being on site to take care of that project as well. I will call Eric now and confirm the backhoe with the hammer attachment for 9/18-9/20. Respectfully, Daphne On Sat, Sep 14, 2013 at 4:23 PM, Jeffrey Epstein <[email protected]> wrote: ok do it it should take no more than 3 days , rfor the trees. jules said two . unless they also need it for the pool project? On Sat, Sep 14, 2013 at 11:57 AM, Daphne Wallace <dlbwallaccagmail.com> wrote: Greetings Sir, I called the owner regarding your offer of $5K flat for the rental. Eric explained that he is pulling the equipment off of another job to accommodate us, and losing the 2 weekend days (approximately $2,080) by allowing the equipment to stay on LSJE so our project is not slowed down by having to bring the equipment back and forth. He says he cannot go any lower. I have previously researched other companies for equipment rentals - availability, costs, quality of work, willing to work "off-island", etc. The other companies were competitive in price, until I explained to them the location of the job, and the mobilization costs made them higher than Grade-All. Respectfully, Daphne EFTA_R1_00434541 EFTA01960322 On Sat, Sep 14, 2013 at 10:31 AM, <[email protected]> wrote: Offerv5k Sorry for typos On Sep 14, 2013, at 11:21 AM, Daphne Wallace ‹ > wrote: > Greetings Mr. Epstein, > Chris requested that I rent a backhoe with the hammer attachment so he can begin the prep work for the 50 palm plantings at the berm. > Grade-All has the equipment with the operator available starting Wednesday, 9/18 to Friday, 9/27. The equipment will remain on LSJE over the weekend, at no cost. > The estimated cost is 7 days X 8 hrs/day X $130/hr = $7,280 > This week I will be contacting the company from whom we purchased the JD 310J backhoe to obtain a quote for the purchase of a hammer attachment, as per your directive to purchase one for LSJE. > Respectfully, > Daphne ******************************** *************************** The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited EFTA_R1_00434542 EFTA01960323 and may be unlawful. If you have received this communication in error, please notify us immediately by return c-mail or by c-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00434543 EFTA01960324
ℹ️ Document Details
SHA-256
8a1083aecbc853bc351ad3d9969e60c08039598bcb5cb448596580dcfe0adf6a
Bates Number
EFTA01960322
Dataset
DataSet-10
Document Type
document
Pages
3
Link copied!