THE MOST IMPORTANT FIRST STEPS TO BUILDING A TENNIS COURT
Building a tennis court is not difficult. Just like any other project you take on, planning, preparation, and information are
the keys to your success. This article will provide enough information to help you plan and prepare for the construction
of a beautiful, structurally sound tennis court. Let's get started.
DO YOU HAVE ENOUGH ROOM FOR A COURT?
In many cases, where you place the court is not the issue. Unless you own five or more acres of land, your main concern
is probably, do I have enough room for a tennis court? Here are a few facts for those who fall into this category:
• A full size, regulation tennis court is 60' wide by 120' long. The USIA (United States Tennis Association) says a
recreational court can be as small as 52' x 110' and still accommodate quality play. Multiple courts sharing the
same surface and fence should have 12 feet between each court and from the fence line or any other side
obstruction, and 21 feet from the baseline to the back fence. For example, a regulation two court battery would
measure, at least, 108' wide by 120' long. If you want fence between the two courts, the dimensions would be
120' wide by 120' long. See the diagrams below:
FULL SIZE 2 COURT BATTERY WITH DIVIDER FENCE STANDARD 2 COURT BATTERY
4 120' • IOW
rJ (9
• • • •
12' 12'
12' • 36 —144— 24' 36' 12' b 12' 4- 31s. 12'
rA F.0
r-
•
I
rl
A 6W
• Generally, you should plan for a minimum apron of 5 feet around the court perimeter, if the surrounding
landscape is close to the same elevation as the tennis court. If the landscape changes dramatically (i.e. the side
of a hill) you should plan for a minimum of 10 feet of consistent, relatively true, grade following the court sub-
grade (the prepared ground for the court). See the diagrams below:
EFTA00607771
MINIMUM GRADED APRON AROUND COURT 10 FOOT GRADED APRON AROUND COURT
4 go. -4.
4- 7w
A
A
DRAINAGE CONSIDERATIONS
You should always plan drainage from the surrounding landscape to drain around and away from the court. This
may require swales or retaining walls. The diagram below illustrates a simple grading plan. Notice how water is
routed from the high side of the landscape, around the court, and then down the landscape beyond the court. You
never want your drainage plan to allow water from the landscape to drain across the court surface.
A tennis court should slope 1 inch in every 10 feet. The optimal direction of the slope is from one side to the other.
For instance, a regulation single court measures 60 feet wide. That means it should have 6 inches of fall from one
side to the other. In many cases the topography around the court will not lend itself to a side to side slope and you
will have to slope the court from end to end or corner to corner. The only slope that is not conducive to quality
tennis is a court that is sloped in two directions. An example would be to have the peak of the slope at the net line
with the court sloping toward the each of the back ends. I call this the rooftop slope and it should be avoided at all
cost. The slope of a tennis court must be in one continuous plane. See the sketch of one slope and drainage plan in
the next graphic.
EFTA00607772
TYPICAL GRADING PLAN AROUND TENNIS COURT
•) 4,903tEfr-I
Coon Slope < Landscape Slope
Cour Slops I Landscape Slope
Court Slope Landscape Slope
* )-- )164106as I—t
SWALE
TENNIS COURT LANDSCikPe
LANDSCAPE i
LAYOUT THE PROPOSED COURT AREA
Once you have a spot you believe will be big enough for your court, it's time to lay it out. You'll only need a few
items to accomplish this: a 150' tape measure, a bundle of irrigation flags, a can of bright orange upside down spray
paint, and a calculator with the square-root (V) function. The first step is to pick a line which represents one edge of
your court. It may be a side you want to run parallel to your house at a certain distance. It may just be a line you
pick in the middle of a field that will orient your court properly to the sun. The USIA suggest optimal orientation for
a tennis court is:, true north/south for the upper two thirds of the US, and 15 — 25 degrees west of true north for the
southern 1/3 of the country.
Whatever line you choose, use your tape measure to find the two ends and mark them with the irrigation flags.
After the flags are set, find your square corners using the instructions in the diagram below. If your court
dimensions are different than 60' x 120', you can determine the diagonal (long leg of the triangle) by using the
Pythagorean Theorem. Now you know why a calculator was on the list. For those who are not math geniuses here's
what you do: (1) multiply the length times itself and hit the M+ key, (2) multiply the width times itself and hit the
M+ key again, (3) hit the MR key and then the V key, and Violal The number on the screen is the diagonal for your
court. This diagonal ensures your court layout is square. When the diagonals intersect with the respective length
and width your court is square.
EFTA00607773
MEASUREMENTS FOR COURT LAYOUT
60.
SHOULD I HIRE A LANDSCAPE ARCHITECT?
You are now at the point where a couple of major decisions have to be made. The first decision is whether or not to
hire a landscape architect. If you live out in the country, as I do, and have lots of relatively flat land, you may not
need one. If you live in a metropolitan area, or on less than 5 acres, you will need a civil engineer, general
contractor, or landscape architect just to make sure you are in compliance with the local building and zoning laws
and to pull the necessary permits. The landscape architect is the most versatile of the three. He will not only handle
the permitting and drainage issues, but will also be able to incorporate your court into the surrounding landscape so
that is aesthetically pleasing. They are experts in all aspects of outdoor design and construction.
SHOULD I HAVE MY COURT SITE TESTED?
Once the location of your court has been finalized, you should consider hiring a geotechnical (soil) engineer. You will
want them to perform hand-auger borings in at least 6 points, preferably 10, on the location you have chosen for
the court. See the diagram below for boring locations. The borings test for: unstable soil, high ground water, buried
organic debris (tree stumps, construction trash, etc...), and many other conditions which determine the suitability of
the proposed construction site. Honestly, most people skip this step, and 95% of the time they don't notice any
negative effect for years, if ever. For the 5% who skip this step and build on sites with serious problems, the repair
costs are out of all proportion to the testing fees they saved. I have seen areas sink 3 inches deep by 30 feet in
diameter, in one year, in the middle of a new court and have pulled out stumps, logs, carpet, lumber, and just about
everything else. Conditions such as high ground water and unstable soils may not affect you court immediately, but
will eventually manifest themselves as cracks, and/or settlement of the surface.
Your landscape architect will probably be able to recommend a good engineer, or you can check the yellow pages.
Try to find, at least, three firms and compare prices. In Atlanta, prices vary between $500.00 and $1500.00 dollars
for essentially the same services. The engineer will perform the hand-auger borings to a depth of 6' and provide a
EFTA00607774
report detailing the soil conditions every 12". His report will also describe any problem conditions and recommend
corrective measures.
LOCATIONS FOR HAND-AUGER TESTING
HOW DO I PROCEED FROM HERE?
You are now ready to drive real stakes in the ground. If the planned court is anywhere close to your property line
set-backs, easements or other restricted areas, hire a surveyor for this step. If your court encroaches on any of
these restrictions, even a little, you may find yourself tearing it out and starting over. Once the stakes are set you
can begin getting estimates from tennis court contractors who will provide a "turn-key" construction package or
from individual specialty contractors if you decide to handle the project as your own general contractor. You may
also want to build some or all of the court yourself. Whichever way you decide to move forward, if you have
followed the steps we have outlined, your court project is starting on solid foundation (figuratively and literally). We
offer detailed instructions on every aspect of court construction in our store. These instructions are provided free
when you purchase related construction products from us. These instructions are invaluable whether you hire
someone for the installation or you do it yourself. Someone once said, "Knowledge Is Power".
Thank you for taking the time to read our article. If you have any questions or would like more information, contact:
Mark Montemayor, or
EFTA00607775
ℹ️ Document Details
SHA-256
8b8923f7e7311e0c9e473d3f6be20ecdb9fe6df2a99ff3bb57d92e26d5c69649
Bates Number
EFTA00607771
Dataset
DataSet-9
Type
document
Pages
5
💬 Comments 0