To: jeevacationepgmail.com[jeevacation©gmail.com]; Jeff Epstein[[email protected]]
From: Marc Dober
Sent Tue 11/29/2011 6:56:04 PM
Subject: Fwd: Construction questions
Here is the email from Tom
Begin forwarded message:
From: thomas melnick
Date: November 21, 2011 2:18:23 PM EST
To: mark Brice Gorden cO MI
Subject: RE: Construction questions
#12 should that be the beach cottage Paul Ferreras plans ....Nov 10th dwgs
???
#2 we have started the form stripping process and have the mason on line for monday
the 28th , to erect the 2nd lift of cmu units to beam elevation... once that is done
then we start the forms for 2nd lift of concrete work ...approx 12/14 pour date
,then roof trusses on 12/20 ..so we are not stopping on the exterior shell of the
building ..1 hope to have the building roof dried in by Jan 5th
# 8 starting temp enclosure through bathroom access per brice's request.....
# 9 replaster in 5 days...???? how much of the existing are going to remove ....we also
have access problems for this area ...we should have a pre plastering mtg first...
#10 working on column design now ....
#11 working on clearing this area right now ....for layout when jeff gets here
# 1 railings and painting are done ...
From:
To:
Subject: . onstruction questions
Date: Mon, 21 Nov 2011 13:54:53 -0500
Please review to see if I am missing anything
Thanks
EFTA_R1_00487640
EFTA01993875
Marc
From: Marc Dober [mailto:
Sent: Monday, November 21, 2011 11:44 AM
To: Jeffrey Epstein
Cc: thomas melnick
Subject: Construction questions
Jeff,
Here are most of the construction questions;
1. Need a decision on the dock house railing paint color
2. Tom needs to get architectural drawings and final design for 5 palms. He will be
back in this area during your visit and we need some direction there or we will
need to stop.
3. Flagpole — sent many pictures with the walls painted — do you still want to raise
the gates to hide area all together.
4. Flagpole — do you want a gate on the lattice box — there needs to be access to the
back equipment room
5. Flagpole — what landscaping do you want along the lattice wall that faces the
road. You originally wanted ficus but please confirm
6. Do you want us to finish the wall to the info center? We are 95% complete
7. Palm tree placement on big hill — the new measurements are - the distance from
the wall to the line, is 13'6" which is 8'6" closer to the wall than the last line which
was 22 feet from the wall. The "new line" is a line made by Shane the surveyor and
myself based on your request to have a line "level with the foundation of the
Cabana 4 wall" . Please confirm
8. Gym renovations — need a scope of what you want done here.
9. Flagpole pool — sent you an email on proposed schedule to re-plaster. Basically he
said he can be in and out in 5 days once all material is on island. 5 days does not
seem logical here.
EFTA_R1_00487641
EFTA01993876
10. Dock shelter- all the material for the dock shelter is on island. We need a design
to get started.
11. New Helipad — when do you want to do this so I can get it scheduled with Tom.
12. Staff cottage — we need a full set of plans and architectural drawings. Tom can't
build off what we have been given.
Thanks
Marc
EFTA_R1_00487642
EFTA01993877
ℹ️ Document Details
SHA-256
8c6c40b21721bdaf7677788fb4b710e92c256b59a81d55b79720388909e05cab
Bates Number
EFTA01993875
Dataset
DataSet-10
Document Type
document
Pages
3