From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Cc: brice gordon cta,
Subject: Danny's Report of activities for the last two weeks - August 10, 2012
Date: Fri, 10 Aug 2012 19:00:02 +0000
Greetings Mr. Epstein,
Below for your review and comments, Danny has outlined the projects that the staff has been working on for the
period 7/30/12 - 8/10/12:
7/30 - 8/03/12
Clement and Benny: fabricated the 5 doors for the Engineering shed bays - this was a time-consuming task
because they milled and created the tongue-n-grove - the lumber for this project was recycled lumber that was on
site.
Gary and TJ - redid the berm's stone threshold, painted the woodshop
Sharimo - repaired several of the gators
Jules - worked on road compaction, replaced the berm boulders, crane operator for the batch plant removal
Brian, Sheridan, Karl - removed the equipment out of the tunnel so the floor could be epoxyed
Peter and landscaping crew - replanted half of the sundial where the trees died, tied down the palms for hurricane
PreP
Lester - captained the boats and barge, assisted with Little C's engine removal and the removal of the batch plant.
Guy - renewed a 3" water line, assisted in all of the barge runs, repaired the hoses in the barge bilge.
Boscoe, Carlos - on vacation
Dulce, Katie, Sandra - household maintenance, secured the shutters on the doors throughout the main compound
as part of the hurricane prep
Cuthbert (Smiley) - pool maintenance, RO, fuel and electrical readings
8/06 - 8/10/12
Clement and Benny: hung all the doors in the Engineering shed bays, fabricated the shelving, completed the
plasterwork around the doorframes.
Gary and TJ - painted and caulked all five Engineering shed bays, assisted in the plasterwork around the door
frames.
Brian - built the Engineering shed outer wall, epoxyed the floors of the Engineering shed, assisted Boscoe with
loading the Office trailer on the barge, epoxy, cleaned up the area where the office trailer used to sit, epoxying
the floors of the first 3 bays
Sharimo, Sheridan, Karl - general vehicle and equipment maintenance and repairs
EFTA00641903
Jules - prepared potential site on Beach 3 for JE review, restored Beach 3, removed old road down to
Engineering, assisted with Office trialer removal
Peter and landscaping crew - install rebar for 5 Palms palms tie down, inside berm rock removal and cleanup,
general landscaping maintenance
Lester - on leave first 3 days, transported the Office trailer to St. Thomas
Guy - assisted Danny with re-wiring the Engineering shed bays, barge mate, assisted Boscoe with barge repairs,
assisted Clement with erecting the subwall in one of the Engineering bays, assisted with the removal of the
Office trailer on St. Thomas.
Boscoe - barge repairs, barge runs in Lester's absence, researching quotes for Big N project and vehicle and
equipment repairs, removed the Office trailer to the barge
Carlos - boat captain, shopping, clearing cargo, researching quotes for various projects
Dulce, Katie, Sandra - household maintenance
Smiley - water maintenance, electrical and fuel readings
Respectfully submitted,
Daphne
EFTA00641904
ℹ️ Document Details
SHA-256
8de43c9837f33d0b81ac6d89a3f456b1a3e34bcd433ab580005ed1c99cdf4f4d
Bates Number
EFTA00641903
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0