From: Richard Kahn <
Sent: Thursday, July 12, 2018 12:09 PM
To: Jeffrey Epstein
Subject: Prosolar
i am speaking with Prosolar tomorrow 10am below =s a summary of work they did..
not sure this =ystem will ever work the way it should..
Richard Kahn
HBRK Associates =nc.
575 Lexington =venue, 4th Floor
New York, NY =0022
tel =
fax =
cell =
Begin forwarded message:
From: Brian Prosolar < <mailto >>
Subject: Re: Friday June 29th
Date: July 11, 2018 at 12:08:05 PM EDT
To: Richard Kahn <
Cc: Brad Spernak <mailto », michael glidden
, =rice Gordon < <mailto >
Morning =ichard,
Let =99s schedule Friday morning at 10 EST.
I =99ve asked Dan to wrap up his synopsis today. I just need the detail so =e can accurately record what
transpired.
Regards,
Brian =alden
ProSolar America, llc
Director of Operations
c. <tell
EFTA_R1_01791218
EFTA02602675
Begin forwarded message:
From: =/b>Marcelo <
Subject: =/b>FW: FW: Friday =une 29th
Date: =/b>July 11, 2018 at 2:10:17 PM =DT
To: =/b>' '<
Cc: Brian Walden < >, Brad Spernak
<mailto
Good Afternoon Richard,
Please =ee the below email containing Dan's summary of what actions he =erformed on his last visit to GSJ.
Regards, =/span>
Marcelo =erez
Project Manager
www.prosolaramerica.com <http://www.prosolaramerica.com/>
From: Dan Prosolar <mailto
Sent: Wednesday, July 11, 2018 1:10 PM
To: Marcelo <mailto
Subject: Re: FW: Friday June 29th
Good afternoon all, sorry for the delay my =mail had an issue and became unlinked so I wasn't
receiving =hese untill now. Regarding GSJ here is what's been =chieved.
2
EFTA_R1_01791219
EFTA02602676
-all Aquion battery modules are wired to =ypass the corroded, water damaged circuit boards
that could interfere =ith charging profiles.
-sunny islands (6) were downgraded to firmware =ersion 6.0.02. This was done to allow a
broader, linear charge profile =o be set
-charging parameters are now based on voltage =et points rather than state of charge
calculations done internally with =ifferent references.
-max charge voltage has been set to 58.5V and =he batteries will not stop charging untill a
voltage 1.5V over the set =imit is a achieved for 15 seconds. This gives them the ability to =erpase the previous charge
voltage of 56.7V
- the main issue that caused so much down time =efore was as follows. A target charge voltage
that matched the Aquion =atteries was not possible with the previous profile. Compiled on that =as faulty Aquion circuit
boards preventing the batteries from properly =harging to a suitable voltage. Aquion, as we know, is no more, so =t's
impossible to obtain replacement parts. Aquions bms never =et the as advertised performance and created more issues
than we could =ave imagined. In short, the changed I made allowed for a higher, more =uitable battery voltage to be
achieved and prevents the premature shut =own we saw before.
Again, sorry for the delay, hope all is =ell
Thanks
Dan Chrisman
Senior Technical Specialist
Prosolar LLC
From: Richard Kahn <mailto >
Sent: Wednesday, July 11, 2018 10:30 AM
To: Brian Prosolar <mailto >
3
EFTA_R1_01791220
EFTA02602677
Cc: Brad Spernak <mailto > ; michael =lidden; Brice Gordon
<mailto >;
Subject: Re: Friday June 29th
can we do thursday morning or anytime =riday
when can expect Dan's summary?
please advise
thank you
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
l
a
cell
On Jul 10, 2018, at 2:18 PM, Brian Prosolar =It
<mailto > wrote:
Afternoon Richard,
Brad is traveling to San Francisco for a =onference and I'm boarding a plane to
STX. I've asked =an to write a synopsis of his efforts and we have been monitoring for =roper function. I'll relay this
tomorrow once he's =inished.
We're still evaluating but all is =unctioning as intended for the moment.
Additional monitoring and =onfirmation are needed since the weather over the last week has been =xtremely cloudy.
Would it be possible to have our call on =hurs. afternoon at 3 EST?
Regards,
Brian Walden
4
EFTA_R1_01791221
EFTA02602678
ProSolar America, =Ic
Director of Operations
c. <tel
On Jul 10, 2018, at 1:50 PM, =ichard Kahn <
<mailto: > wrote:
i have not yet heard back from anyone on a =ime to speak
please advise
thank you
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
cell
tel
fax=
On Jul 9, 2018, at 5:36 PM, Richard Kahn =lt
<mailto: > wrote:
can we please arrange a call for tomorrow to =eview current status of GSJ solar
thank you
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
tel
fax
cell
MI
New York, NY 10022
5
EFTA_R1_01791222
EFTA02602679
On Jun 29, 2018, at 1:36 PM, Brian Prosolar =It
<mailto > wrote:
Afternoon Rich,
I believe the normal boat arrival time is 8 or =:30 a.m. in Redhook.
Dan will be there.
Regards,
Brian Walden
ProSolar America, =lc
Director of Operations
c. <tel
On Jun 29, 2018, at 1:20 PM, =ichard Kahn <
<mailto: > wrote:
please confirm what time you will be arriving =t GSJ on Monday
thank you
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
cell
fax=
6
EFTA_R1_01791223
EFTA02602680
On Jun 28, 2018, at 1:42 PM, Brian Prosolar =It
<mailto > wrote:
Afternoon Richard,
We're still trying to have a final =iscussion with Stefan as well as track down
multiple 128MB or smaller =D cards to reboot the Sunnyboy inverters. We're moving as =uickly as we can in order to
execute the conversion plan but it looks =ike we have to push to Monday. Dan has shown Michael how to get the
=ystem back up and operating in the event of it dropping offline and =hat is working for the interim.
Regards,
Brian Walden
c.
On Jun 28, 2018, at 11:08 AM, =ichard Kahn <
<mailto > wrote:
please confirm that you will be at GSJ =omorrow to work on the Solar
thank you
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
a
cell
On Jun 25, 2018, at 7:27 PM, Brian Prosolar =It
<mailto > wrote:
7
EFTA_R1_01791224
EFTA02602681
I want to ensure we have the PCB bypass =iscussion with the engineers prior to
the visit and will try to =xpedite.
Brian Walden
EE/RE Consultant
c. <tel
On Jun 25, 2018, at 5:05 PM, =ichard Kahn <
<mailto: > wrote:
we are without any solar currently
can you please try to have dan come sooner
thank you
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
MI
New York, NY 10022
tel
fax
cell
On Jun 25, 2018, at 4:31 PM, Brian Prosolar =It
<mailto > wrote:
Afternoon Richard,
I have Dan on the schedule to head to GSJ on =riday.
Regards,
8
EFTA_R1_01791225
EFTA02602682
Brian Walden
ProSolar America, LIc
Dir. of Operations
c. <tell
On Jun 25, 2018, at 3:30 PM, =ichard Kahn <
<mailto: > wrote:
can you please advise when your men can come =n and fix our solar system
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cell
9
EFTA_R1_01791226
EFTA02602683
ℹ️ Document Details
SHA-256
8e0feabad73fd51a93fe4be98fff5b2a711a63580bbfba947cae6ec8c44f3334
Bates Number
EFTA02602675
Dataset
DataSet-11
Type
document
Pages
9
💬 Comments 0