EFTA02022233
EFTA02022234 DataSet-10
EFTA02022237

EFTA02022234.pdf

DataSet-10 3 pages 581 words document
P17 P23 V16 P19 D4
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (581 words)
To: jeevacation mail.com 'eevacation grnail.corn]; Jeffrey Epstein[[email protected]]; Gary Kerney Cc: Tom Sza Doug Schoettle From: Warwick Wicksman Sent: Fri 1/28/2011 3:44:43 PM Subject: RE: LSJ Update Hi Jeffrey. Tom forwarded your message to me. We've also been concerned that the living room/pool building has been going round and round a bit on the basic planning, but it looks like we have the layout and basic circulation pretty set now, and the team will move forward to refine that design. We will have the plans, sections and elevations developed to point that by the end of next week, we can start reviewing how the infrastructure will work with Gary. We will now put the flagpole pool concept design ahead of the Spa, and send you some images early next week. We do have the reference images you sent us before, and will use those as a guideline. Thanks, Warwick Warwick Wicksman, AIA Princi al Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA nttp://vvww.GenSler.com Click here to viewGensler's 2010 Annual Report. From: Tom Sze Sent: Friday, January 28, 2011 7:03 AM To: Warwick Wicksman Subject: FW: LSJ Update from Jeffrey... EFTA_R1_00528388 EFTA02022234 From: Jeffrey Epstein [[email protected]] Sent: Friday, January 28, 2011 1:03 AM To: Tom Sze Subject: Re: ISJ Update please start the flagpole pool, tom„ Please send images. so that we are on the same page. the missing door in the pool area , and the fact that we are still at basic plan stage is concerning On Fri, Jan 28, 2011 at 1:37 AM, Tom Sze <I=MME> wrote: Jeffrey, It was nice talking with you today. Major changes for the Pool/Living Room area in our discussion are: I) We have eliminated the Mezzanine/Balcony level at +48'. 2) We will study some options for the exterior stair at the northwest corner which is now going from +57' down to +38'. 3) We are going with the Option B Pool shape, which mimics the pool at the Ritz in Paris. ( Photos you sent us ) 4) There will be two sets of doors symmetrically placed on the north elevation. 5) Same sets of doors at the south wall. 6) We will study placing the Shower at the southeast corner with a possible view to the east ( This may impact the location and access to the Pool Mechanical space. ) 7) At the +59' level, we will come up with some ideas of what to do with the 20' deck off of the living room. We should have some ideas out to you at the beginning of next week. Meanwhile, we would like to start some design sketches on the spa and the Flagpole pool based on our meeting with you on the Island a few weeks ago. Let us know if this works for you and thanks, Tom EFTA_R1_00528389 EFTA02022235 Tom Sze, A1A Senior Associate Direct Main Mobile Gensler 2500 Broadway Suite 300 Santa Monica California 90404 USA The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jcp, acationisgmail coin, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00528390 EFTA02022236
ℹ️ Document Details
SHA-256
8e158d98234daf29a2a5a3e1e710c7c2cd83ac81fffaf1325f833b94967899b3
Bates Number
EFTA02022234
Dataset
DataSet-10
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!