EFTA00732929.pdf
👁 1
💬 0
📄 Extracted Text (131 words)
From: "Gary Kerney"
To: "Jeffrey Epstein"
Subject: FW: Library Courtyard
Date: Thu, 22 Apr 2010 22:55:17 +0000
Attachments: X-Library_Courtyard-April_22_2010.pdf; DSCN3820.JPG
Jeffrey
Here's a proposal for the library court Gary
From: Abram Muljana [mailto:
Sent: Thu 4/22/2010 5:53 PM
To: Ga Kerne ;
Cc:
Subject: Library Courtyard
Shelley:
Gary:
Enclosed is our proposal for the Library Courtyard.
As noted on drawing, the border on the perimeter is concrete with medium-size exposed aggregate, the grid is local
pebbles imbedded in cement and the field is broom sweep gray concrete (as used in original design).
The current concrete border along the perimeter will need to be adjusted to achieve this pattern.
Let us know what you think.
Best,
ABRAM MULJANA
ROBERT COUTURIER. INC.
69 MERCER STREET. 3RD FLOOR
NEW YORK. NY 10012
EFTA00732929
EFTA00732930
ℹ️ Document Details
SHA-256
8e30c30a77f43d096a1ef54df3bbf6e14eba8f63ec67d216d2ec1ea76a40ad7c
Bates Number
EFTA00732929
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0