📄 Extracted Text (525 words)
From: Ann Rodriquez
Sent: Sunday, September 3, 2017 8:49 PM
To: jeffrey E.
Cc: Richard Kahn; Daphne Wallace
Subject: Re: Big N: Crown Bay Marina -Big N secured-
Big N is safe C/
<=r>
I went down to Crown Bay to handle all the paper work and to m=ke sure that it's in a secured spot. Our guys will head
down first thing in=the morning to add more straps and ropes to secure Big N as much as possibl=
Gene was insisting that Big N needed to leave today so they could s=cure Subbase Dry Dock.
Ann R.
=n Sep 3, 2017, at 1:34 PM, Ann Rodriquez > wrote:
Big N is at Subbase Dry Dock at the moment.
<=iv id="AppleMailSignature">
Gene i= putting her back into the water this afternoon. It will go to Crown Bay to=orrow night or Tuesday
morning and our guys will get it strapped and tied p=operly.
I'll forward photos once Big N is secured.
Gene said t=is morning that it can't stay during the storm even though he personally to=d Daphne and my self
on Friday that it could. Gene said Hurricane Irma migh= be to severe for SBDD to hold Big N so for safety reasons it won't
be able=to stay.
Ann R.
[email protected] <mailto:jeevacation@gm=il.com» wrote:
Subject: Little St. James <=b>
EFTA_R1_01388772
EFTA02377901
Good Day Ann,
I have attached our Hurricane evacuation protocol.&nb=p; This has all the information needed for
staying in the marina during a s=orm. From the nights that are not occurred during the storm the cha=ge will be $2.00
per foot per night.
70 x $2.00 =$140.0O per night. If you have an= other questions or concerns please feel free to give us a
call.
Thank you,
Liza
Liza Lord
Crown Bay Marina
8168 Crown Bay Marina Ste. 528
St. Thomas, VI 00802
[email protected] <mailto:[email protected]>
w=w.crownbay.com <http://www.crownbay.com>
<=IV>
Hey Bossman,
2
EFTA_R1_01388773
EFTA02377902
I've been speaking with Liza f=om Crown Bay Marina (across from SBDD) to see if they can fit us into
their=storage area. Liza is working on it and should have more info on storage fe= in about an hour
Our only other option is for Carlos to take it to V=rgin Gorda this afternoon but I don't think the Barge is capable
of that ru= due to bad weather, worn seals on steering shaft, water going into the eng=ne room and Hydraulic fluid
leaking. The cut off date to deliver Big N to V= Dry Dock is Monday morning.
awaiting s=orage quote from Crown Bay Marina. I'll keep everyone posted... =/span>
<=span>
http://viconsortium.=om/featured/hurricane-irma-continues-track-to-leeward-island=/
<http://viconsortium.com/featured/hurricane-irma=continues-track-to-leeward-islands/>
https://www.yahoo.com/news/going-223240149.html <https://www.yahoo.com/news/hurricane-irma-worried-
w=ere-going-223240149.html>
Ann R.
=br>
&=bsp; please note
The information contained i= this communication is
confidential, may be attorney-client privileged, m=y
constitute inside information, and is intended only for
the use of t=e addressee. It is the property of
JEE
Unauthorized use, disclosure o= copying of this
communication or any part thereof is strictly prohibite=
and may be unlawful. If you have received this
communication in erro=, please notify us immediately by
return e-mail or by e-mail to [email protected], a=d
destroy this communication and all copies thereof,
including all at=achments. copyright -all rights reserved
3
EFTA_R1_01388774
EFTA02377903
ℹ️ Document Details
SHA-256
8e7f1824f304410ba33d1ff696c7df2667c2d4c184f0ef5cda88a93dfd03dfb1
Bates Number
EFTA02377901
Dataset
DataSet-11
Document Type
document
Pages
3
Comments 0